Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Const. Of Parshuram Bhawan, Brahman Sabha, Jind (Only For L/C Societies)
|
Description |
Const. Of Parshuram Bhawan, Brahman Sabha, Jind (Only For L/C Societies)
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_448827_1 |
Reference Number |
2025E90E6D43 FA32 4162 9E14 39094C2AD9E7300ULB |
Tender Fee | 2180 |
EMD | 16920 |
Tender Value | |
Place | Jind |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=526336 |
Start Date | May 24, 2025 00:00 |
End Date |
30/05/2025 ( Expired 39 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Consultancy services for preparation of dpr for 4 l of rudrampur to bhadrachalam section from km 71.0 to 171.6 of vijayawada to jagadalpur section of nh 30 and construction of kothagudem bypass connecting nh 930p and nh 30 in the state of telangana
Read moreDesign, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Design, engineering, manufacture, supply and delivery of new ip rotor (with full blading) for turbine model,c 210-130 (for 210 mw unit of kolaghat tps) through capex 2025-26
Read moreSpecial repair of various link roads under special repair program of link roads 2022-23, 2023-24, 2024-25 falling under mc ludhiana l-59.84 km gno.1 including maintenance of road for 5 year (one year defect liability period plus for year maintenance
Special repair of various link roads under special repair program of link roads 2022-23, 2023-24, 2024-25 falling under mc ludhiana l-59.84 km gno.1 including maintenance of road for 5 year (one year defect liability period plus for year maintenance
Read moreTender for leasing of office space at 3rd floor, deendayal bhawan, ashok nagar, janpath, bhubaneswar
Tender for leasing of office space at 3rd floor, deendayal bhawan, ashok nagar, janpath, bhubaneswar
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreSs of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Ss of c/sand (dry) for pmt wks of constr/ imprvt of rd hangu- chor ii to nhsl (ps) spfcn from km 0.00 to km 4.00 through dept exec mode under 130 rcc/ 764 brtf (p) swtk in the state of sikkim, job no. 307/04
Read moreSpecial repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period
Special repair to nabha bir dosanjah road odr059 l-5.95 km under head-5054 rb-10 in distt patiala including maintenance of road for five year one year defect liability period and four year maintenance period&#x0d
Read moreof your Industry type