Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Segmental Box Girder Erection With Overhead Launching Girder And With Ground Support System (Gss) In Connection With Rvnl S Pune Metro Rail Project, Design And Construction Of Elevated Viaduct Of Length 4.519 Kms From Ch: ( )1079.899 M To Ch: ( )5599.298 M Between Pcmc And Nigdi (Bhakti Shakti) On The North South Corridor Of Pune Metro Rail Project Reach1 Extension In The State Of Maharashtra, India
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77460174 |
Reference Number |
RVNL-Pune-Metro-Launching |
Tender Fee | 0 |
EMD | 58.82 Lakh |
Tender Value | |
Place | New Delhi |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77460174/viewNitPdf_4718258.pdf |
Start Date | September 18, 2024 21:39 |
End Date |
04/10/2024 ( Expired 260 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Detailed design consultancy services for 14 (fourteen) elevated stations viz. kharadi chowk dandekar pul, excluding viaduct in station portion on kharadi khadakwasla corridor of pune metro rail project.
Detailed design consultancy services for 14 (fourteen) elevated stations viz. kharadi chowk dandekar pul, excluding viaduct in station portion on kharadi khadakwasla corridor of pune metro rail project.
Read moreSegmental box girder erection with overhead launching girder and with ground support system (gss) in connection with rvnl s pune metro rail project, design and construction of elevated viaduct of length 4.519 kms from ch: (-)1079.899 m to ch: (-)5599.298 m between pcmc and nigdi (bhakti-shakti) on the north-south corridor of pune metro rail project- reach1 - extension in the state of maharashtra, india
For complete deion and other details, please refer to tender
Read moreAppointment of proof checking consultant for detailed structural design of viaduct of pcmc to nigdi corridor (4.52 km approx.) of pune metro rail project.
Appointment of proof checking consultant for detailed structural design of viaduct of pcmc to nigdi corridor (4.52 km approx.) of pune metro rail project.
Read moreConstruction of important bridge no. 18 over barakar river (10 x 30.50m 5x45.7m open web girder) with pile foundation located at ch.230.124 km (centre line of bridge from hwh in between barakar and kumardhubi station and ror (1x45.7m1x76.2m3x30.5m open web girder ) in between barachak -sitarampur at ch. 219.117 km and ror (2x30.5m1x76.2m open web steel girder) in between sitarampur - kulti at ch. 224.508km and ror 4x30.5m 1x76.2 m open web girder at ch 206.05 km in between kalipa
For complete deion and other details, please refer to tender
Read morePart design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Part design and construction of elevated viaduct and six elevated (excluding architectural finishing ) from chainage 625.00 m to 7747.00 m of bhubaneswar metro phase-i mrts.
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Read moreConstruction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o
Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Read moreDesign and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Design and construction of elevated metro viaduct for nmrp phase-2 in i. between ch (-) 7577.056 m to ch (-) 13457.046 m of length 5.9 km in reach 2b ii. between ch 18218.586 m to ch 24633.194 m of length 6.414 km in reach 3a iii. between ch (-) 289.
Read moreEngagement of ddc for arch. and bs incl. e and m traction works and cw for depot and occ building including proof checking of substructure for viaduct, special span including its superstructure and stations for bhubaneswar metro rail project of bmrc
Engagement of ddc for arch. and bs incl. e and m traction works and cw for depot and occ building including proof checking of substructure for viaduct, special span including its superstructure and stations for bhubaneswar metro rail project of bmrc
Read moreof your Industry type