Tender Details
Particulars | Details |
---|---|
Title |
Transformer Oil Testing Of 3 Nos. 5 Mva Transformers Installed In Substation A And 12 Nos. In Chp Of Kakri Project.
|
Description |
Transformer Oil Testing Of 3 Nos. 5 Mva Transformers Installed In Substation A And 12 Nos. In Chp Of Kakri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 6500 |
Tender Value | |
Place | NCL KAKRI PROJECT |
Link |
AAAAAAAAAA Login to view |
Start Date | May 10, 2025 14:30 |
End Date |
20/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
E-tender for procurement and installation of 3 nos of medium liquid nitrogen plant along with 100 kva voltage stabilizer for west tripura, gomati and unakoti districts to strengthen ai network in tripura state during the year 2025-2026
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDrilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Drilling, installation and maintainance of 5 nos. of tube well (solar) at mouza-dudhe budhe and gobrageriya under keshiary block in the district of paschim medinipur under dpmu, paschim medinipur, wbadmi project ph-ii
Read moreSupply erection, fitting and fixing of 16 mtr high mast 10 nos with led floodlights at 1 late subash ghishing memorial community hall dowhill 2 naya busty graveyard 3 grenhill turning 4 eagle crag parks and garden 5 chandmari fatak dara 6 puru thul
Supply erection, fitting and fixing of 16 mtr high mast 10 nos with led floodlights at 1 late subash ghishing memorial community hall dowhill 2 naya busty graveyard 3 grenhill turning 4 eagle crag parks and garden 5 chandmari fatak dara 6 puru thul
Read moreDesign, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Design, supply, installation, testing and commissioning of 33kv/6.6kv substation and allied electrical and civil work for providing power supply to 2 no. electric mhcs of apsez in nsd for container handling
Read moreRepair of oil leakage in gsu transformers installed at power house of chamera power station-1.
Repair of oil leakage in gsu transformers installed at power house of chamera power station-1.
Read moreProcurement of 5 nos. 66kv 2000a 31.5 ka 2000 amp horizontal centre break isolator with without earth switch along with mom terminal connectors etc complete in all respects as per technical specifications attached and as per relevant lates
Procurement of 5 nos. 66kv 2000a 31.5 ka 2000 amp horizontal centre break isolator with without earth switch along with mom terminal connectors etc complete in all respects as per technical specifications attached and as per relevant latest iec is
Read more3 phase, 50 hz, 5 mva, 33/3.3 kv step down, outdoor onan power transformers complete with all accessories /fittings and conforming
3 phase, 50 hz, 5 mva, 33/3.3 kv step down, outdoor onan power transformers complete with all accessories /fittings and conforming
Read moreOperation of the 09 nos dg sets installed in the agmc and gbp hospital agartala round the clock for a period of 06 months
Operation of the 09 nos dg sets installed in the agmc and gbp hospital agartala round the clock for a period of 06 months
Read moreof your Industry type