Particulars | Details |
---|---|
Title |
Transformer Oil Testing Of 3 Nos. 5 Mva Transformers Installed In Substation A And 12 Nos. In Chp Of Kakri Project.
|
Description |
Transformer Oil Testing Of 3 Nos. 5 Mva Transformers Installed In Substation A And 12 Nos. In Chp Of Kakri Project.
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_335156_1 |
Reference Number |
NCL/KKR/ENM/Tender/2025-26/59 |
Tender Fee | 0 |
EMD | 6500 |
Tender Value | |
Place | NCL KAKRI PROJECT |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347432 |
Start Date | May 10, 2025 14:30 |
End Date |
20/05/2025 ( Expired 41 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
E.l.d.c.no/smii/p1/1231/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 1zones1 2 3 4 and 5&#x0d
Read moreManufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Manufacturing testing supply erection and commissioning of 1 no 33 by 11 kv 5 mva 3 phase power transformer at shanan ph pspcl
Read moreReconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra
Read moreDesign manufacture testing before dispatch delivery of 1,30,000 nos. ht guy strain insulators brown glazed, 9000 kg. strength as per fig-3 and designation-c of is-5300 with latest amendments, if any and as per pspcl specification qq-2365
Design manufacture testing before dispatch delivery of 1,30,000 nos. ht guy strain insulators brown glazed, 9000 kg. strength as per fig-3 and designation-c of is-5300 with latest amendments, if any and as per pspcl specification qq-2365
Read moreFor the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
For the work of residual life assessment test of 40 mva transformer-i (gec alsthom make) at 220 kv substation sarh and 40 mva transformer -i (gec alsthom make) and 40 mva transformer -iii (alstom make) at 132kv substation krishna nagar under etd-ii,
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreSpecial repair of various link roads under special repair program 2022-23, 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 3
Special repair of various link roads under special repair program 2022-23, 2023-24 and 2024-25 including 5 year routine maintenance in mc patran district patiala group 3
Read moreSpecial repair of various link roads under special repair program 2022-23,202-24 and 2024-25 including 5 year routine maintenance in mc ghanour. (group-3)
Special repair of various link roads under special repair program 2022-23,202-24 and 2024-25 including 5 year routine maintenance in mc ghanour. (group-3)
Read moreReplacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Replacement of cooling towers installed at various underground metro stations of line 2 and 3 in dmrc network.
Read moreof your Industry type