Tender Details
About Tender
❄️procurement Opportunity: Upgradation Of Telemetry Stations For Snow Hydrology 🌄📡 The Central Water Commission's Snow Hydrology Division Invites Bids For The Upgradation Of Existing Telemetry Stations From Bubbler To Radar Based Sensors, Including Compatible Data Loggers, As Part Of Its Commitment To Advanced Hydrological Monitoring. 📅 Bid Submission Deadline: April 25, 2024, 2:00 Pm The Project Will Be Executed In Himachal Pradesh. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 138,972. Bidders Should Demonstrate Expertise In The Field Of Hydrological Monitoring Systems And Provide Detailed Proposals, Including Technical Specifications, Pricing, And Implementation Timelines. Keywords: Central Water Commission, Snow Hydrology Division, Telemetry Stations, Radar Based Sensors, Data Loggers, Hydrological Monitoring, Government Tender, Himachal PradeshParticulars | Details |
---|---|
Title |
Up Gradation Of Existing Telemetry Stations From Bubbler To Radar Based Sensors With Compatible Data Logger Under Snow Hydrology Division, Central Water Commission, Shimla
|
Description |
Up Gradation Of Existing Telemetry Stations From Bubbler To Radar Based Sensors With Compatible Data Logger Under Snow Hydrology Division, Central Water Commission, Shimla
|
Organisation | Central Water Commission- DoWR RD and GR | Central Govt. Ministry/Department |
Tender Id | 2024_CWC_793019_1 |
Reference Number |
SHD/CWC/349/2023-24/10 |
Tender Fee | 0 |
EMD | 1.39 Lakh |
Tender Value | |
Place | Himachal Pradesh |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=833502 |
Start Date | February 02, 2024 15:30 |
End Date |
25/04/2024 ( Expired 412 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Performance based maintenance contracts pbmc estimate of rehabilitation and up-gradation to two / four lane with paved shoulders from amdi junction to saoner, from km 226.140 to km 265.724 design chainage of nh753 in the state of maharashtra total le
Read moreRehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders
Read moreStrengthen up gradation widening of existing db road from dendua rail gate to bonjemhary rail crossing under salanpur block at paschim bardhaman zilla parishad in the district of paschim bardhaman for 2024-25
Strengthen up gradation widening of existing db road from dendua rail gate to bonjemhary rail crossing under salanpur block at paschim bardhaman zilla parishad in the district of paschim bardhaman for 2024-25
Read moreStrengthening and up gradation works with making the top surface of the sahitya sabha bye lane_sl. 6
Strengthening and up gradation works with making the top surface of the sahitya sabha bye lane (ch 0.00 to ch 0.318) from temple street to bandh, under cooch behar division (pwd)in the district of cooch behar of the year 2025-2026.
Read moreMaintenance of rws scheme under ampi block/sh- improvement of water quality by up-gradation of existing 10,000/5,000 gph capacity package type iron removal plant attached with dtw schemes at different locations under ampi dws sub-division during the
Maintenance of rws scheme under ampi block/sh- improvement of water quality by up-gradation of existing 10,000/5,000 gph capacity package type iron removal plant attached with dtw schemes at different locations under ampi dws sub-division during the
Read moreUpgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Upgradation of existing nh-115 from 2-lane configuration to 2-lane with paved shoulder from km 44.369 to km 54.806 (l 10.437 km) in tinsukia district under dibrugarh nh division in the state of assam under epc mode (job no. 115/as/2024-25/283)
Read moreRfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Rfp for the work of improvement and up-gradation to two lane with paved shoulder configuration from existing km.7.410 to km. 56.245(design chainage km 0.000 to km.49.235) hadia chauraha to karmaini ghat section of nh-328 in the state of uttar pradesh
Read moreImprovement of water quality by up-gradation of existing 10,000/7,500/5,000/ 2,500 gph capacity package type irp attached with dtw schemes at different locations of bokafa block under dws sub-division santirbazar during the year 2025-26.
Improvement of water quality by up-gradation of existing 10,000/7,500/5,000/ 2,500 gph capacity package type irp attached with dtw schemes at different locations of bokafa block under dws sub-division santirbazar during the year 2025-26.
Read morePerformance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Performance based maintenance contracts (pbmc) estimate of rehabilitation and up-gradation to two/four lane with paved shoulders from amdi junction to saoner, from km 226/140 to km 265/724 (design chainage) of nh-753 in the state of maharashtra (tota
Read moreA/r and m/o to various roads under division swr-ii, pwd delhi, during 2024-25 (sh repairing of existing storm water drain along with construction of footpath in opposite of govt. dispensary at chawala village on najafgarh bijwasan road (id 1173), und
A/r and m/o to various roads under division swr-ii, pwd delhi, during 2024-25 (sh repairing of existing storm water drain along with construction of footpath in opposite of govt. dispensary at chawala village on najafgarh bijwasan road (id 1173), und
Read moreof your Industry type