Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shortening Of Discharge Drum And Structures Of Link Belt Conveyor For A Length Of Approx.18 Mtr. At Mic, J.P.Colly
|
| Description |
Shortening Of Discharge Drum And Structures Of Link Belt Conveyor For A Length Of Approx.18 Mtr. At Mic, J.P.Colly
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_ECL_343386_1 |
|
Reference Number |
ECL/GM/JNR/EnM/A2/25-26/64 dated 01.09.2025 |
| Tender Fee | 0 |
| EMD | 2900 |
| Tender Value | - |
| Place | JHANJRA UNDERGROUND |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=355954 |
| Start Date | September 09, 2025 16:30 |
| End Date |
Expired
19/09/2025
Expired 392 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
08 (eight) nos. vulcanizing joints for steel cord belt conveyor of mic, jhanjra project colliery.
Read moreRepairing/new change of m.s shell and en-24 shaft of 1200 mm belt main belt discharge drum in skip pocket for u.g in vertical section moonidih project wj area. sl.no.mnd/discharge drum/skip pocket/01
Repairing/new change of m.s shell and en-24 shaft of 1200 mm belt main belt discharge drum in skip pocket for u.g in vertical section moonidih project wj area. sl.no.mnd/discharge drum/skip pocket/01
Read moreRepair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Repair and strengthening of damaged discharge chute of belt conveyor unit 105 at moonidih coal washery
Read moreChanging of tail end drum of 22 l belt, changing of discharge drum of 1 dip and 4 dip 1st belt and installation of 1000 mm double drive belt in t-18 panel for jhilimili ug mine of jhilimili sub area.
Changing of tail end drum of 22 l belt, changing of discharge drum of 1 dip and 4 dip 1st belt and installation of 1000 mm double drive belt in t-18 panel for jhilimili ug mine of jhilimili sub area.
Read moreRepairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Repairing of five nos. conveyor pulley (pcc 36a, pcc 58a, pcc 50a, pcc 51a, pcc 59a) of different size and two nos. conveyor drum (pcc 128, pcc 112) of mic, jhanjra project colliery
Read moreCustom bid for services - fabrication of 300 nos bottom rollers with all internals for 1600mm belt conveyor m s pipe approx 6 inches to be supplied by secl
Custom bid for services - fabrication of 300 nos bottom rollers with all internals for 1600mm belt conveyor m s pipe approx 6 inches to be supplied by secl
Read moreYamaha gm20xu 20 channel mixer,ahuja sms 450 monitor speaker,studio master xr20l hrhm 1 hd band mic,mars drum stick,10 mtr 6.35mm jack to jack cable,yamaha fc4 sustain pedal,5 meter xlr f to f connector cable,guitar stand
Yamaha gm20xu 20 channel mixer,ahuja sms 450 monitor speaker,studio master xr20l hrhm 1 hd band mic,mars drum stick,10 mtr 6.35mm jack to jack cable,yamaha fc4 sustain pedal,5 meter xlr f to f connector cable,guitar stand
Read moreExtension of 6r belt approx. 96 meter and shortening of 6r belt conveyor by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam of mic, jhanjra project colliery
Extension of 6r belt approx. 96 meter and shortening of 6r belt conveyor by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam of mic, jhanjra project colliery
Read moreExtension of 4r belt approx. 96 meter and shortening of 4r belt conveyor of by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam mic, jhanjra project colliery.
Extension of 4r belt approx. 96 meter and shortening of 4r belt conveyor of by 26 pillars (832 mtr.) for depillaring panel-3 by cm-2 in rv seam mic, jhanjra project colliery.
Read moreStrengthening of 19xd tandem belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling, also strengthening of 65l belt conveyor by installation of discharge drum of 65l belt conveyor at 3n4 incline, j.p.colly.
Strengthening of 19xd tandem belt conveyor by fabrication of fixed unit of loop take up, installing gear coupling, also strengthening of 65l belt conveyor by installation of discharge drum of 65l belt conveyor at 3n4 incline, j.p.colly.
Read moreof your Industry type