Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Beatification Dressing Of Nunwan Base Camp By Way Of Removal Of Debris Filling Of Pits Repairing Of Cracks
|
| Description |
Beatification Dressing Of Nunwan Base Camp By Way Of Removal Of Debris Filling Of Pits Repairing Of Cracks
|
| Organisation | DC-PDD | State Govt. and UT |
| Tender Id | 2024_PDD_247254_1 |
|
Reference Number |
EDB/e-tender/94 of 2023-24 |
| Tender Fee | 200 |
| EMD | 500 |
| Tender Value | - |
| Place | ED Bijbehara |
| Link |
View Original Tender Notice
https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=721880 |
| Start Date | March 15, 2024 22:30 |
| End Date |
Expired
02/04/2024
Expired 929 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Works contract for carrying out i) stain removal, clearing of debris & wastes, wrapping of toilet pans/commode, wash basin & dustbin and stickering works in railway passenger coaches (other than trainset coaches), ii) water filling to check plumbing leakage in furnished coaches and iii) laying of dummy pvc sheets in lhb pp coaches
Works contract for carrying out i) stain removal, clearing of debris & wastes, wrapping of toilet pans/commode, wash basin & dustbin and stickering works in railway passenger coaches (other than trainset coaches), ii) water filling to check plumbing leakage in furnished coaches and iii) laying of dummy pvc sheets in lhb pp coaches
Read moreSite preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Site preparation and removal of damaged material,repair of existing sub base,repair of asphalt base,crack filling and surface levelling,repair or re coating of synthetic volleyball court surface,synthetic surface resurfacing system,court line marking,repair of drainage slope or water stagnation areas,volleyball poles and net arrangement,referee chair repair or replacement,water remover roller repair or replacement,digital scoreboard repair or replacement,cleaning and final finishing
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreInter dental brush pack of 5,cavity linear calcium hydroxide readiopaque tube 10 gms,disposable rvg sensor sleeves pkt of 1000,prophylaxis paste jar of 300 to 500 gms,calcium hydroxide root canal dressing filling paste in syringe,articulating paper,patient bib plastic,dental floss pack of 50,plaster dental stone pkt of 1 kg,box denture and appliance,denture adhesive powder bott of 15 gm,wax modelling base plate wax box of 226 point 85 gms
Inter dental brush pack of 5,cavity linear calcium hydroxide readiopaque tube 10 gms,disposable rvg sensor sleeves pkt of 1000,prophylaxis paste jar of 300 to 500 gms,calcium hydroxide root canal dressing filling paste in syringe,articulating paper,patient bib plastic,dental floss pack of 50,plaster dental stone pkt of 1 kg,box denture and appliance,denture adhesive powder bott of 15 gm,wax modelling base plate wax box of 226 point 85 gms
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreBasic amenities at base camp at nunwan
&#x0d &#x0d basic amenities at base camp at nunwan&#x0d basic amenities at base camp at nunwan&#x0d pahalgam
Read moreBasic amenities provision- base camp at nunwan pahalgam.
Basic amenities provision- base camp at nunwan pahalgam.
Read moreConstruction of soakage pit of ct/pt at nunwan base camp
Construction of soakage pit of ct/pt at nunwan base camp
Read moreConstruction of cgi fencing around langar at nunwan base camp alongside jim (sanjy-2023)
Construction of cgi fencing around langar at nunwan base camp alongside jim sanjy2023
Read moreConstruction of rsfp with pst for nunwan base camp and adjoining areas (construction successful testing
Construction of rsfp with pst for nunwan base camp and adjoining areas (construction successful testing
Read moreof your Industry type