Tender Details
Particulars | Details |
---|---|
Title |
Construction Of W.B.M. Road From Vr 34 Approach Road Sh 61 To Sawangi Magar Dhengali Pimpalgaon Road Km 0/00 To 6/500. Tq. Manwat And Dist. Parbhani.
|
Description |
Construction Of W.B.M. Road From Vr 34 Approach Road Sh 61 To Sawangi Magar Dhengali Pimpalgaon Road Km 0/00 To 6/500. Tq. Manwat And Dist. Parbhani.
|
Organisation | RDD-CEO-PARBHANI | State Govt. and UT |
Tender Id | 2024_PARBH_1130762_1 |
Reference Number |
ZPPBN/WD/eTENDER/632/24-25 |
Tender Fee | 4870 |
EMD | 13635 |
Tender Value | |
Place | Tq. Manwat and Dist. Parbhani. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1971348 |
Start Date | December 28, 2024 00:25 |
End Date |
10/01/2025 ( Expired 148 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Construction of two lane road of submerged length from km-5.90 to 7.575 and km. 32.275 to 33.400 of bhopalpatnam venktapura warangal hyderabad road of nh163 in the state of chhattisgarh.
Read moreConstruction of school building at village pimpalgaon gayake. tq. jintur and dist. parbhani.
Construction of school building at village pimpalgaon gayake. tq. jintur and dist. parbhani.
Read moreConstruction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Construction of c.d.work improvement to s .h 209 to bangarwadi road km 0/00 to 4/570 vr-147 tq.kallam
Read moreConstruction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Construction of donli to punialla link road from km 1st rd 0 to km 9th rd 500 by way of earthwork 1000 mm dia hp culvert 5 00 mtr height semi pucca r wall 15 0 mtr height pucca edge wall 2 5 mtr height semi pucca b wall and create wall
Read moreConstruction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Construction of rcc culverts at sarada colony 14th and 15th lines and cc outfall drain to sarada colony main road from 13th line to 15th line (south side) in div no.50 under ae-6 section.
Read moreConstruction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Construction of rcc culverts at sarada colony 13th and 19th lines and cc outfall drain to sarada colony main road from 13th line to 14th line (north side) in div no.50 under ae-6 section
Read moreof your Industry type