Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tender For The Replacement Of Corroded Ms Pipeline In Cooling Tower System With Cpvc
|
| Description |
Tender For The Replacement Of Corroded Ms Pipeline In Cooling Tower System With Cpvc
|
| Organisation | Pasteur Institute of India | Central Govt. Ministry/Department |
| Tender Id | 2025_PII_811544_1 |
|
Reference Number |
PIIC/TENDER/005/2025-26 |
| Tender Fee | 0 |
| EMD | 1 Lakh |
| Tender Value | - |
| Place | PASTEUR INSTITUTE OF INDIA |
| Link |
View Original Tender Notice
https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1116380 |
| Start Date | September 08, 2025 15:00 |
| End Date |
Expired
06/10/2025
Expired 354 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Group work: (1) vartej- bhavnagar para: replacement of corroded water pipeline (2) bhavnagar: replacement of corroded water pipeline.
For complete deion and other details, please refer to tender
Read moreReplacement of cooling water pipeline
Fabrication and erection of new cooling water supply, pipeline and dismantling of old pipelines
Read moreTender for overhauling, repairing, bearing replacement of 150hp cooling tower motor.
As per the file attached
Read moreReplacement of old defective ms condenser line with new ms pipe and overflow drain water ms line with cpvc pipe for cooling tower 1 to 6 at terrace of acms ac plant.
Replacement of old defective ms condenser line with new ms pipe and overflow drain water ms line with cpvc pipe for cooling tower 1 to 6 at terrace of acms ac plant.
Read moreRepair and overhauling service - replacement of inlet pipeline and elbow in cooling tower bwing cda
Read more
Dismantling and removal of existing corroded structural components of the cooling tower, followed by fabrication, installation, and painting of the new structural element of the cooling tower, prefre-2, nrb, barc, tarapur.
Dismantling and removal of existing corroded structural components of the cooling tower, followed by fabrication, installation, and painting of the new structural element of the cooling tower, prefre-2, nrb, barc, tarapur.
Read moreof your Industry type