Tender Details
Particulars | Details |
---|---|
Title |
Rectification And Balance Work Of 8 L Delhi Vadodara Greenfield Alignment Section Pkg 13 Of Nh 148 N On Epc Mode Under Bharatmala Pariyojana In The State Of Rajasthan On Risk And Cost Of Contractor
|
Description |
Rectification And Balance Work Of 8 L Delhi Vadodara Greenfield Alignment Section Pkg 13 Of Nh 148 N On Epc Mode Under Bharatmala Pariyojana In The State Of Rajasthan On Risk And Cost Of Contractor
|
Organisation | National Highways Authority of India | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 50000 |
EMD | 3.61 Lakh |
Tender Value | |
Place | NHAI PIU KOTA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 14:30 |
End Date |
04/06/2025 ( 43 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Rectification and balance work of 8l delhi vadodara greenfield alignment section pkg-13 of nh 148n on epc mode under bharatmala pariyojana in the state of rajasthan on risk and cost of contractor
Read moreConsultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and up-gradation to 2lps of kalyan - murbad - malshej ghat - nirmal road nh-61 from km 37-850 to km 57-900 (murbad to kadampada section) in the state of maharashtra on epc mode.
Read moreServices of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreConstruction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Construction of service road and slip road between km450.170 to km 471.300 zarap to patradevi section of nh.66 in the state of maharashtra on epc mode
Read moreRehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Rehabilitation and upgradation of ramachandrapuram village limits from km.37.950 to km.38.950 of ibrahimpatnam to ap/telangana border section of nh-30 in the state of andhra pradesh on epc mode.
Read moreOne time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
One time improvement of left over stretches at bypasses and realignment stretches on nh 365 nakrekal tanamcherla section from km 0.0 to 72.0 and nh 167 miryalaguda kodad section km 187.723 to 234.434 in telangana state on epc mode
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreIndependent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Independent engineer services during operation and maintenance of six-laning of nh-71 from renigunta (km. 0.000) to naidupeta (km.57.046) (length-57.046 km.) on hybrid annuity mode in the state of andhra pradesh under bharatmala pariyojana.
Read moreof your Industry type