Tender Details
Particulars | Details |
---|---|
Title |
Improvement Of Street Pavement And Side Drain Of C Block, Dayalpur, Karawal Nagar In Karawal Nagar Constituency (Ac 70).
|
Description |
Improvement Of Street Pavement And Side Drain Of C Block, Dayalpur, Karawal Nagar In Karawal Nagar Constituency (Ac 70).
|
Organisation | Irrigation and Flood Control | State Govt. and UT |
Tender Id | 2024_IFC_253335_1 |
Reference Number |
93/EE/CD-IV/IFC/2023-24/Recall |
Tender Fee | 0 |
EMD | 39782 |
Tender Value | |
Place | East |
Link | https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331297 |
Start Date | February 07, 2024 00:15 |
End Date |
12/02/2024 ( Expired 455 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik
Read moreDesign, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Design, engineering, supply, construction, erection, testing and commissioning of 234 mw(ac) grid tied floating solar pv (fspv) plant on dvc maithon dam reservoir in the state of jharkhand including 10 years comprehensive o and m service
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreRehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Rehabilitation and improvement of main spillway baigul dam (mechanical works) under drip-ii in udham singh nagar
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreShort term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreof your Industry type