Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Misc Fire Fighting Fabrication, Erection Works
|
| Description |
Fabrication And Erection Of Fire Fighting Pipe At 2 X660 Mw, Ntpc Talcher Epc Project
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | 2024_BHEL_41086_1 |
|
Reference Number |
BHE/PW/PUR/TLR/1111 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | 2x660 MW NTPC Talcher Angul Odisha |
| Link |
View Original Tender Notice
https://eprocurebhel.co.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=42834 |
| Start Date | October 23, 2024 18:30 |
| End Date |
Expired
02/11/2024
Expired 698 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreProviding misc., fabrication and erection works at jvr chp
Providing misc., fabrication and erection works at jvr chp epc sathupally, kothagudem area, khammam district, telangana state
Read moreJob work of fabrication and erection in bagasse yard for fire fighting
Job work of fabrication and erection in bagasse yard for fire fighting
Read moreOperation and maintenance of fire fighting system and misc works
R and m and other electrical works at nscbi
 airport kolkata. sh operation and maintenance of fire fighting system including related
 miscellaneous works.
Read moreFire fighting works
Supply, installation, testing and commissioning of fire protection system for 50 bedded covid hospital at falakata s.s.h. in falakata block in the district of alipurduar under alipurduar division, pwd.
Read moreFire fighting works
Supply, installation, testing and commissioning of fire protection system for 50 bedded covid hospital at birpara s.g.h. in birpara madarihat block in the district of alipurduar under alipurduar division, pwd.
Read moreFire fighting works
Supply, installation, testing and commissioning of fire protection system for 100 bedded covid hospital at alipurduar district hospital in the district of alipurduar under alipurduar division, pwd.
Read moreFire fighting works
Fire fighting system for the work of 50 bedded covid hospital in the district of cooch behar at cooch behar government medical college and hospital mjn hospital.
Read moreof your Industry type