Tender Details
Particulars | Details |
---|---|
Title |
Sup Of 150 M3/Hr Loading Lpg Pump,Operation Spares For 2 Year,Supervision Of Itc Of Pumps
|
Description |
|
Organisation | NA | Ministry of Petroleum and Natural Gas |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | |
EMD | |
Tender Value | 2 Crore |
Place | |
Link |
AAAAAAAAAA Login to view |
Start Date | April 15, 2025 17:28 |
End Date |
25/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Short term maintenance contracts from km 0/0-1/6, km1/6-2/6, km 4/6-6/6, km 11/6-12/6 of nh 381a vellakovil - sankagiri road in the state of tamil nadu for the year 2024-25
Read moreShort term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Short term maintenance contract from km 17/560 -18/560, km 25/700 -26/350, km 29/200 -29/790, km 32/000 - 37/500, km 42/0-47/0 and 57/0 -58/3 of new nh 181 (coimbatore to gundlupet road) in the state of tamil nadu for the year 2024-2
Read moreShort term maintenance contract (stmc) work from km 106/2-133/2 of thanjavur - perambalur - attur road of nh-136 in the state of tamil nadu for the year 2024-25
Short term maintenance contract (stmc) work from km 106/2-133/2 of thanjavur perambalur attur road of nh-136 in the state of tamil nadu for the year 2024-25
Read moreManning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Read moreProcurement of spares for hp flush pump in urea plant - 1 no
Procurement of spares for hp flush pump in urea plant - 1 no
Read moreTender for canal water based water supply project for construction of 4.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 0.50 lakh gallon ohsr part-2 at khanauri town
Tender for canal water based water supply project for construction of 4.0 mld water treatment plant wtp and other related works including 5 years operation and maintenance part-2 and construction of 0.50 lakh gallon ohsr part-2 at khanauri town
Read morePreparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Preparation of detailed project report, pre construction activity and supervision for the work of elevated flyover in dhanbad town from km-53(dhansar) on (nh-218) to govindpur on nh-19 (old nh-2) in the state of jharkhand
Read moreConstruction of 2 lannig with paved shoulder of daudnagar, nasriganj and dawath bypass of nh 120 in the state of bihar on epc mode for year 2024_2025
Construction of 2 lannig with paved shoulder of daudnagar, nasriganj and dawath bypass of nh 120 in the state of bihar on epc mode for year 2024-2025
Read moreOperation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Operation and upkeepment of existing deep tube well and iron removal plant (modified type) at malanchaniwas govt. qtr. complex under central-i sub-division, pwd(building) for 365 days during the year 2025-26.
Read moreConsultancy services for authoritys engineer for supervision of construction of damteng selungthi lungar chuna road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km)
Consultancy services for ase for supervision of constr of dslc road (package 2) from km 7.40 to km 57.5 nhsl specifications (design chainage km 7.45 to km 56.29 and length 48.84 km) under (p) vtk in the state of arunachal pradesh through epc mode
Read moreof your Industry type