Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
General Annual Maintenance Kip Rbmc Annual Maintenance Of Canals Rbmc Ch 0 M To 16950 M, Punnala Distributory From Ch 0 M To 9820 M, Mukkuttumon Distributory From Ch 0 M To 4505 M And Chekom Distributory From Ch 0 M To 2507m During 2023 24
|
| Description |
Annual Maintenance Like
Clearing Light Jungle, Removal Of Silt And
Sediments From Canals, Removal Of Floating
Bodies During Water Distribution Using Labourers
|
| Organisation | Government of Kerala |
| Tender Id | 2023_Irrig_622876_1 |
|
Reference Number |
IRR/PII/TR/2784/2023_5_1_1/1 |
| Tender Fee | 1285 |
| EMD | 12270 |
| Tender Value | - |
| Place | Thenmala |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | November 18, 2023 15:30 |
| End Date |
Expired
25/11/2023
Expired 1053 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
General budget work kip rb punnala distributory rectification work to prevent leakage of canal between ch 6900m to 7110m and ch 7310m to 7600m near poovannamoodu in piravanthoor panchayath general civil work
Read moreExtension by incorporating piped irrigation system for of dwc 9 off taking from ch 9 18 km of b 2 distributory of rbmc of tip in village allarna of pernem taluka
Extension by incorporating piped irrigation system for of dwc 9 off taking from ch 9 18 km of b 2 distributory of rbmc of tip in village allarna of pernem taluka
Read moreGeneral action plan 2026 27annual maintanance desilting of karunagappally branch canal from ch0m to 6580m pavumba distributory from ch.0 m to 5780 m chathiyara minor from ch 0 m to 1400 m puthuchira minor from ch 0 m to 750 m and kannanchalil
General action plan 2026 27annual maintanance desilting of karunagappally branch canal from ch0m to 6580m pavumba distributory from ch.0 m to 5780 m chathiyara minor from ch 0 m to 1400 m puthuchira minor from ch 0 m to 750 m and kannanchalil
Read moreGeneral-action plan 2026-27-annual maintenance desilting of thuruthikkara distributory ch 0 m to 5280m and minor canals under kip o m section no 12 3 bharanikkavu general civil work
General-action plan 2026-27-annual maintenance desilting of thuruthikkara distributory ch 0 m to 5280m and minor canals under kip o m section no 12 3 bharanikkavu general civil work
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charummoodu clearing jungle silt and floating body removal pazhakulam distributory at ch 0 to 1315 m and its minors general civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charummoodu clearing jungle silt and floating body removal pazhakulam distributory at ch 0 to 1315 m and its minors general civil work
Read moreGeneral action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for kurathikad distributory at ch 0 to 6800 m and its minorsgeneral civil work
General action plan 2026 2027 kip o m annual maintenance work under the section 13 4 charumoodu clearing jungle silt and floating body removal for kurathikad distributory at ch 0 to 6800 m and its minorsgeneral civil work
Read moreGeneral kip rbmc annual maintenance of canals clearing light jungle and removal of silt and sediments and removing floating materials from rbmc ch 0m to 16950m punnala distributory ch 0m to 9820m mukkuttumon distributory and chekom distributory
Annual maintenance like clearing light jungle,&#x0d removal of silt and sediments from canals,&#x0d removal of floating bos during water&#x0d distribution using labourers are included in this&#x0d estimate. .
Read moreMp lads punnala distributory construction of culvert across punnala distributory at ch 7880m and rectification of punnala distributory between ch 7850m to ch7890m general civil work
Clearing&#x0d jungle demolishing cement concrete earthwork&#x0d excavation cc 1 4 8 for base of footing rcc&#x0d 1 2 4 for footing and abutment rcc 1 1 5 3 for&#x0d deck slab bed block and parapet provisions for&#x0d centering shuttering and painting
Read moreAp 2023 24 mangalam project improvement (rbmc ch 4 520 km ) of punnappadam distributory ch 4 300 km to 4 500km
Earth work, demolishing cement concrete, centering and shuttering, reinforcement, pvc wheep holes , plastering and filling
Read moreGeneral cada work 2023 2024 mangalam project cs vdy improvement of peechamkode field channel ch 0/000 km to ch 0/320 km offtakes from ch 3/900 km of padoor distributory of rbmc general civil work
Clearing grass demolishing cc earth work exacavation cc 1_4_8 cc 1_3_6 cc 1_2 _4 cc 1_1 5_3 centering and shuttering reinforcement plastering interlocking tiles for approach road etc
Read moreof your Industry type