Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Dry Toilet At Gapshan Post Of 16th Bn Itbp
|
Description |
Construction Of Dry Toilet At Gapshan Post Of 16th Bn Itbp
|
Organisation | Central Public Procurement Portal 1 |
Tender Id | 2023_ITBP_776600_1 |
Reference Number |
ITBP/16thbn/ENGR/2023-1142 dated 16-10-2023 |
Tender Fee | 0 |
EMD | 3689 |
Tender Value | |
Place | Commandant 16th bn ITBP LEh Ladakh |
Link | https://eprocure.gov.in |
Start Date | October 17, 2023 23:00 |
End Date |
27/10/2023 ( Expired 600 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Construction of rcc drain from ramji vishwakarma house to hari tiwari house at ward no.37 chandawal
Read moreConstruction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Construction of sea wall/shore protection work at mus in car nicobar (450 mtr) in andaman and nicobar islands.
Read moreConstruction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Construction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.
Read moreConstruction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Construction of 4 lane bypass to vellore town ing from km 47.400 of nh-75 and ending at km 12.650 of nh-38 (length 20.492 km) in the state of tamil nadu.
Read moreof your Industry type