Tender Details
About Tender
🔧 Ttps Mech Ii Tm I Unit Iii Overhauling Bid 🔧 Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Overhauling Of High Pressure (Hp) And Low Pressure (Lp) Bypass Valves, As Well As Control And Relief Valves (Crh Nr Vs) For Unit Iii Of The Mechanical Ii Team I During The Upcoming Annual Overhaul In 2024 2025. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm The Tender Fee Is Set At Inr 3600. Interested Bidders Must Demonstrate Expertise In The Overhauling Of Power Plant Valves And Adhere To The Specified Project Timelines And Quality Standards. Keywords: Ttps, Tneb Limited, Overhauling, Power Plant Valves, Hp Lp Bypass Valves, Crh Nr Vs, Annual Overhaul, State Govt. And Ut, Tender, BidParticulars | Details |
---|---|
Title |
Ttps Mech Ii Tm I Unit Iii Overhauling Of Hp Lp By Pass Valves And Crh Nr Vs During Annual Overhaul 2024 2025
|
Description |
Ttps Mech Ii Tm I Unit Iii Overhauling Of Hp Lp By Pass Valves And Crh Nr Vs During Annual Overhaul 2024 2025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459575_1 |
Reference Number |
CE/TTPS/SE/M-II/No.304/2024-25 |
Tender Fee | 0 |
EMD | 3600 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=546271 |
Start Date | July 03, 2024 19:30 |
End Date |
18/07/2024 ( Expired 301 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Application and supply of ceramic fiber pad insulation and thermal insulation on pipe lines, valves, re-generative equipments etc. during annual overhauling of unit no.-3 of 3x210mw, atps, anpara
Read moreOverhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Overhauling of hp, lp valves, nrvs, actuators, l.p.and h.p. heaters, ejectors, drain coolers and toc and 4-way,2-way valves of unit no.-3 of 3x210 mw, atps, anpara
Read moreOverhauling of lp/hp co2 booster compressors and drive turbine train of urea plant at nfl, bathinda unit
Overhauling of lp/hp co2 booster compressors and drive turbine train of urea plant at nfl, bathinda unit
Read moreSupply of iron and steel materials for unit i ii and iii primary air secondary air duct flue gas ducts airpreheaters and esp
Supply of iron and steel materials for unit i ii and iii primary air secondary air duct flue gas ducts airpreheaters and esp
Read moreCarrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Carrying out annual overhauling of heat recovery steam generator hp, ip and lp water/steam system valves of various sizes, safety valves, stg and hrsg flash tank, ibd and cbd tanks, gland steam condenser, deaerator and feed water storage tank overhau
Read moreMtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Mtps i tm i dismantling inspection and overhauling of pennwalt centrifuges 4a 4b in unit iv during coh 2025 26
Read moreTtps operation circle mpm ii acp replacement of defective cooling coil of ahu b and brassomatic valve of compressor in unit iii ac plant
Ttps operation circle mpm ii acp replacement of defective cooling coil of ahu b and brassomatic valve of compressor in unit iii ac plant
Read moreTtps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Ttps operation circle cad annual maintenance of unit iii lt 415v ac switch gear bus modules, incomer breaker, tie breaker and 6.6kv/433v, 1600kva, acwph service transformer iii during the forth coming annual overhaul period 2025 to 2026 in acwph
Read moreTtps operation circle mpm ii ac plant renewing of worn out air intake louvers with weld mesh and supporting frames at unit iii fan house
Ttps operation circle mpm ii ac plant renewing of worn out air intake louvers with weld mesh and supporting frames at unit iii fan house
Read moreof your Industry type