Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Drawing, Supply, Erection, Testing And Commissioning Of 25 K V Ohe Work,Modification Of Existing 25 K V Ac, 50 Hz Single Phase Ohe,Switching Post And Scada Works At Existing Yard At Mungoli Nirguda Open Cast Mine Of Wani Area For Wcl
|
| Description |
Design, Drawing, Supply, Erection, Testing And Commissioning Of 25 K V Ohe Work,Modification Of Existing 25 K V Ac, 50 Hz Single Phase Ohe,Switching Post And Scada Works At Existing Yard At Mungoli Nirguda Open Cast Mine Of Wani Area For Wcl
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_RITES_165892_1 |
|
Reference Number |
RITES /GM /NGP /WCL /Mungoli /OHE / T-06-2023 |
| Tender Fee | 15000 |
| EMD | 30.27 Lakh |
| Tender Value | - |
| Place | Nagpur |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | August 31, 2023 20:00 |
| End Date |
Expired
27/09/2023
Expired 1117 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, erection, testing & commissioning of 50hz, single phase 25 kv ac ohe in c/w provision of shower testing facility at kjgy yard.
Design, supply, erection, testing & commissioning of 50hz, single phase 25 kv ac ohe in c/w provision of shower testing facility at kjgy yard.
Read moreRestructuring of old 400kv system of ph 3 ,up gradation existing scada system of 400 kv system of ph 4 and integration of upgraded scada system with 400 kv system of ph 3 stps sarni.
Restructuring of old 400kv system of ph 3 ,up gradation existing scada system of 400 kv system of ph 4 and integration of upgraded scada system with 400 kv system of ph 3 stps sarni.
Read moreDesign, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.
Design, detail engineering, manufacture, sitc of 25 kv ac traction (rigid ohe), 33 kv auxiliary sub stations (ass), associated cabling and scada systems from r. k. ashram to kartavya bhawan of phase-v(a) delhi mrts project.
Read moreDdc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Ddc for design of 25 kv overhead equipment (ohe) system, power supply and scada for the elevated lines including checking of design of receiving substations and design validation of dmrc phase-iv project.
Read moreDesign, supply, erection, testing & commissioning of 132/2x25kv traction substations (scott connected transformer) with associated switching posts for 2x25 kv at feeding system & scada in churu - sadulpur & bhiwani -dobh bahali sections of bikaner division of north western railway.
Design, supply, erection, testing & commissioning of 132/2x25kv traction substations (scott connected transformer) with associated switching posts for 2x25 kv at feeding system & scada in churu - sadulpur & bhiwani -dobh bahali sections of bikaner division of north western railway.
Read moreDesign, supply, erection, testing & commissioning of 132kv/2x25kv traction sub stations (scott connected transformer) with associated switching posts for 2 x 25 kv at feeding system & scada in jaipur - sawaimadhopur section of jaipur division of north western railway.
Design, supply, erection, testing & commissioning of 132kv/2x25kv traction sub stations (scott connected transformer) with associated switching posts for 2 x 25 kv at feeding system & scada in jaipur - sawaimadhopur section of jaipur division of north western railway.
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreDesign, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Design, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Read moreDesign, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Design, supply, erection, testing, commissioning of 2 x 25 kv ac, single phase ohe between pachora (including pachora yard) to jamner including ohe modification work in pachora yard & removal of ohe infringement, in connection with gauge conversion work from pachora-jamner (approx. rkm is 53.3 km & approx. tkm is 80km, project commences from km 374.300 (distance from mumbai) to km 427.600 of existing narrow gauge chainage) in bhusawal division of central railway.
Read moreof your Industry type