Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Semi Automatic Rotary Microtome
|
| Description |
|
| Organisation | CENTRAL MINE PLANNING and DESIGN INSTITUTE Limited | Ministry of Coal |
| Tender Id | GEM/2024/B/4710887 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 29, 2024 19:43 |
| End Date |
Expired
11/03/2024
Expired 901 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | BIO-TECHNIKA | Make : MEDIMEAS INSTRUMENTS Model : MRM-ST (E) Title : MICROTOME | 11-03-2024 13:15:01 | Registered with designated Agency / Authority | N/A | Disqualified |
| 2 | Bioapps | Make : LEICA Model : HistoCore MULTICUT,149MULTI0C1 Title : Semi Automatic Rotary Microtome | 11-03-2024 11:55:45 | Offline upload | N/A | Qualified |
| 3 | OPULENCE PHARMA & HEALTHCARE SERVICES | Make : International Quality Instruments Model : SAM-17 Title : SAM-17 Roatry Microtome | 15-03-2024 14:57:41 | Registered with designated Agency / Authority | N/A | Disqualified |
Empanelment of manpower services providers for supply of highly skilled, skilled, semi-skilled and unskilled manpower on outsourcing basis.
Empanelment of manpower services providers for supply of highly skilled, skilled, semi-skilled and unskilled manpower on outsourcing basis.
Read moreThe supply, installation and commissioning of automatic rescue devices ard units and anual maintenance contract for the otis lifts of mandya institute of medical sciences, mandya
The supply, installation and commissioning of automatic rescue devices ard units and anual maintenance contract for the otis lifts of mandya institute of medical sciences, mandya
Read moreManpower outsourcing services - minimum wage - skilled graduate admin,manpower outsourcing services - minimum wage - highly-skilled diploma it-technical,manpower outsourcing services - minimum wage - semi-skilled high school others,manpower outsourcing services - minimum wage - skilled diploma admin,manpower outsourcing services - minimum wage - semi-skilled secondary school others,manpower outsourcing services - minimum wage - unskilled secondary school others
Read more
Provision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Provision of approach road, pcc flooring and gate foundation for proposed automatic gate system at the entry point of coal rake between andal railway siding, west bengal to dstps, dvc plant siding.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Hiring of 2 (two) nos not less than 500 tph capacity mobile/semi-mobile crushers for crushing of 47.4 lt of coal to (-)100mm size (in all dimensions) including provision , installation of crushing unit with all infrastructure with crushing and conveying the crushed coal on to sccl conveyors including operation and maintenance of the crusher/semi-mobile crusher and other allied jobs for a period of 3 years at ktk oc-iii, bhp area. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreHiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Hiring of not less than 500tph capacity mobile/semi-mobile crusher for crushing total quantity of 39lt of coal to -100mm size (in all dimensions) including provision , installation of 1 crushing unit with all infrastructure with crushing and loading the crushed coal at rg oc-iii project, rg-2 area for a period of 3 years. in division no:corp-mp.
Read moreof your Industry type