Tender Details
Particulars | Details |
---|---|
Title |
Erection Of 3.3 Kv Overhead Line From Main Substation To West Substation At Jhingurda Project
|
Description |
Erection Of 3.3 Kv Overhead Line From Main Substation To West Substation At Jhingurda Project
|
Organisation | Northern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_NCL_334377_1 |
Reference Number |
NCL/JRD/ENM/Tender/25-26/07 |
Tender Fee | 0 |
EMD | 2000 |
Tender Value | |
Place | Jhingurda Project |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346628 |
Start Date | April 22, 2025 00:25 |
End Date |
02/05/2025 ( Expired 10 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreProviding road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Providing road safety measures at morth/police identified locations based on accident data of 2017-19,2018-20 and 2019-21 from km.34.144 (kothur) to km.80.306 (jadcherla) of hyderabad bangalore section of nh-44 in the state of telangana
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreChambal alwar bharatpur water supply project package 2 based on hybrid annuity model ace(p) bharatpur nit no. 05 / 2024-25
Work of construction of intermediate cwph at kotra baseri laying of clear water transmission main from kotra to naroli nadbai via junction 2 at naroli ips nadbai nagar ramgarh kishangarhbas tijara jairoli and bhiwadi based on ham model under jjm
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreConstruction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Construction of fob at km.61.800 (village lalpur), at km.225.500 at km. 284.340 (village aram sarai), high mast at km. 61.680 and drain from km. 61.400 to km. 61.960 (bhs) on ghaziabad aligarh mainpuri section of nh-34 in the state of up on epc mode
Read moreConstruction of cc drain at ward no. 02 nandlal kol house to main road.
Construction of cc drain at ward no. 02 nandlal kol house to main road.
Read moreUpgradatrion of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay
Upgradation of rural road from sh connection (near green island school) to rabindranagar ward no 6 at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb22, length 2.700 km)
Read moreof your Industry type