Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of Dwc 1 R And Dwc 2 R Along With Their Field Channels Offtaking B 6 Distributory At Ch. 6.36 Km And 6.457 Km Respectively Of Rbmc Of Tip At Tamboxem Village Of Pernem Taluka (Re Tender).
|
Description |
Construction Of Dwc 1 R And Dwc 2 R Along With Their Field Channels Offtaking B 6 Distributory At Ch. 6.36 Km And 6.457 Km Respectively Of Rbmc Of Tip At Tamboxem Village Of Pernem Taluka (Re Tender).
|
Organisation | WATER RESOURCE DEPARTMENT | State Govt. and UT |
Tender Id | 2025_WRD_19312_1 |
Reference Number |
WRD/WDVII/PB/F.3/24-25/TN-18 |
Tender Fee | 21000 |
EMD | 9.71 Lakh |
Tender Value | |
Place | Tamboxem village in Pernem Taluka, Goa. |
Link | https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=19748 |
Start Date | January 09, 2025 14:30 |
End Date |
20/01/2025 ( Expired 155 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh
Read moreProviding and erecting safety crash barrier at ch. 22.700 km on i.p. side of main canal of sip near gate 2 (right and left side of the road) of cuncolim industrial estate in village cuncolim of salcete taluka
Providing and erecting safety crash barrier at ch. 22.700 km on i.p. side of main canal of sip near gate 2 (right and left side of the road) of cuncolim industrial estate in village cuncolim of salcete taluka
Read moreDeposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Deposit dist panchayath 2025 2026 cpp kkps annual maintenance of field channels offtaking from ch 0 000 to 30 600 km of kunnamkattupathy main canal and its branch canals for the year 2025 26 general civil work general civil work deposit dist panc
Read moreUrgent repairs at ch. 2.410km and ch. 5.150 km for weaker portion of distributory d1 canal in xeldem village of quepem taluka for the year 2024-25.
Urgent repairs at ch. 2.410km and ch. 5.150 km for weaker portion of distributory d1 canal in xeldem village of quepem taluka for the year 2024-25.
Read moreProviding mild steel fencing on lhs and rhs of sedimentation tank of lbmc of tip at ch.28.600 km at cuchelim village of bardez taluka (re-tender).
Providing mild steel fencing on lhs and rhs of sedimentation tank of lbmc of tip at ch.28.600 km at cuchelim village of bardez taluka (re-tender).
Read moreFifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.31.900 km to 32.021 km and ch.32.080 km to 32.430 km in mapusa city of bardez taluka (re-tender).
Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.31.900 km to 32.021 km and ch.32.080 km to 32.430 km in mapusa city of bardez taluka (re-tender).
Read moreFifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.32.760 km to 33.445 km in mapusa city of bardez taluka (re-tender).
Fifth revised estimate of tillari irrigation project (land acquisition) providing barbed wire fencing 1.20m height on lhs and rhs of lbmc of tip from ch.32.760 km to 33.445 km in mapusa city of bardez taluka (re-tender).
Read moreConstruction of dwc 1r and dwc 2r along with their field channels offtaking b-6 distributory at ch. 6.36 km and 6.457 km respectively of rbmc of tip at tamboxem village of pernem taluka. (re-tender) (third call)
Construction of dwc 1r and dwc 2r along with their field channels offtaking b-6 distributory at ch. 6.36 km and 6.457 km respectively of rbmc of tip at tamboxem village of pernem taluka. &#x0d (re-tender) (third call)
Read moreGeneral wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
General wp 2024 2025 modernization of the field channel pezhumkkad to kallingal field channel offtakes at ch 12 036 km tail end of no 3 distributory canal in between ch 0 00 to 0 080 km and ch 0 130 to 0 180 km 1242 2025 general civil work
Read moreConstruction of (a) flexible / rigid pavement at chitegaon from km.9.115 to km.9.800 (b) bidkin village from km 14.943 to km 16.116 bhs (c) minor bridges at ch. 9.106 lhs, ch.14.935 rhs and ch.16.121 rhs and (d) box culvert at ch.9.555 bhs on nh752e
Construction of (a) flexible / rigid pavement at chitegaon from km.9.115 to km.9.800 (b) bidkin village from km 14.943 to km 16.116 bhs (c) minor bridges at ch. 9.106 lhs, ch.14.935 rhs and ch.16.121 rhs and (d) box culvert at ch.9.555 bhs on nh752e
Read moreof your Industry type