Tender Details
Particulars | Details |
---|---|
Title |
Complete Repairing/Rewinding Of (A) 160k Va, 11k V/440 V Transformer Make Power Equipment And Engineers (B) 250 Kva, 11k V/440 V Transformer Make Marsons Electricals (C) Replacement Of Ht And Lt Bushing Insulator With Stud And Cork Sheet In Transformers.
|
Description |
Complete Repairing/Rewinding Of (A) 160k Va, 11k V/440 V Transformer Make Power Equipment And Engineers (B) 250 Kva, 11k V/440 V Transformer Make Marsons Electricals (C) Replacement Of Ht And Lt Bushing Insulator With Stud And Cork Sheet In Transformers.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Dakra OCP, NK Area |
Link |
AAAAAAAAAA Login to view |
Start Date | May 27, 2025 16:30 |
End Date |
06/06/2025 ( 7 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Complete rewinding and repairing of 2000kva 11kv/3.3kv power transformer eef make sl no. 4015057 of adic under kusunda area
Complete rewinding and repairing of 2000kva 11kv/3.3kv power transformer eef make sl no. 4015057 of adic under kusunda area
Read moreRepairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s
Repairing and reconditioning of a. 11 kv 800amp, prabhu make sl no 0526 vcb switch of feeder 1 and b 3.3 kv, 400amp ocb crompton greaves make sl nokugp.ocb.ccl001 used for primary control of lighting transformer 630 kva 3.3kv 440v installed at main s
Read more(a). repairing of 3mva transformer 11kv/3.3kv make-andrew yule, sl.no.-10619 charged at main sub-station of gvp project and (b). replacement of bushing insulator with stud, nut and cork sheet of 500kva, 3.3kv/550v transformer, make-marson, sl.no.-129
(a). repairing of 3mva transformer 11kv/3.3kv make-andrew yule, sl.no.-10619 charged at main sub-station of gvp project and (b). replacement of bushing insulator with stud, nut and cork sheet of 500kva, 3.3kv/550v transformer, make-marson, sl.no.-129
Read moreComplete repairing/rewinding of (a) 160kva, 11kv/440v transformer make power equipment and engineers (b) 250 kva, 11kv/440v transformer make marsons electricals (c) replacement of ht and lt bushing insulator with stud and cork sheet in transformers.
Complete repairing/rewinding of (a) 160kva, 11kv/440v transformer make power equipment and engineers (b) 250 kva, 11kv/440v transformer make marsons electricals (c) replacement of ht and lt bushing insulator with stud and cork sheet in transformers.
Read moreComplete repairing and con of 300kva crompton parkinson make, 11kv/550v, 3 phase power transformer to 11kv/440v lightening transformer sl no. 8842 at beldanga unit under pandaveswar colliery, pandaveswar area
Complete repairing and con of 300kva crompton parkinson make, 11kv/550v, 3 phase power transformer to 11kv/440v lightening transformer sl no. 8842 at beldanga unit under pandaveswar colliery, pandaveswar area
Read moreRepairing/rewinding of 2nos. transformer (a)160 kva, 11kv/440v with sl no. ktc/tr./11kv/160/2 at band basti (b) 100kva, 11kv/440v with sl. no. 1180.1964 installed at dudhmatiya basti under kathara colliery.
Repairing/rewinding of 2nos. transformer (a)160 kva, 11kv/440v with sl no. ktc/tr./11kv/160/2 at band basti (b) 100kva, 11kv/440v with sl. no. 1180.1964 installed at dudhmatiya basti under kathara colliery.
Read moreComplete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad
Complete rewinding, overhauling and repairing of 750 kva, 500 kva and 200 kva 11kv/3.3kv power transformer 3 phase 50 hz vector group-dyn11 at clear water pumping plant jamadoba and different transformers at dfifferent locations under jmada dhanbad
Read moreComplete rewinding and repairing of one 250 kva, 11kv/440v oil cooled transformer of sirka kahuabera substation of sirka colliery
Complete rewinding and repairing of one 250 kva, 11kv/440v oil cooled transformer of sirka kahuabera substation of sirka colliery
Read moreWork complete rewinding and repairing of power transformer 500kva/6.6kv/440v-550v century transformers pvt. ltd. sl. no. 576/14-15 at ampl feeder breaker under abocp mine, block-ii area
Work complete rewinding and repairing of power transformer 500kva/6.6kv/440v-550v century transformers pvt. ltd. sl. no. 576/14-15 at ampl feeder breaker under abocp mine, block-ii area
Read moreComplete repairing or rewinding of 420kw 6.6kv 1488 rpm kirloskar make h.t. motor sl no. 3ff660792 and 500kva 11kv 440v east india electricals make lightening transformer of khottadih ug or project under pandaveswar area
Complete repairing or rewinding of 420kw 6.6kv 1488 rpm kirloskar make h.t. motor sl no. 3ff660792 and 500kva 11kv 440v east india electricals make lightening transformer of khottadih ug or project under pandaveswar area
Read moreof your Industry type