Tender Details

Particulars Details
Title
Jungle Clearance And Silt Removal Between Km 0.000 To 3.820 Of Semra Mr. (Lot 20)
Description
Jungle Clearance And Silt Removal Between Km 0.000 To 3.820 Of Semra Mr. (Lot 20)
Organisation U P Irrigation Department (Civil) | State Govt. and UT
Tender Id 2024_UPIDC_962444_2
Reference
Number
04/AE-III/2024-25
Tender Fee 559
EMD 1420
Tender Value
Place BANDA
Link
View Original Tender Notice

https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1684786

Start Date October 15, 2024 14:30
End Date
Expired 21/10/2024

Expired 611 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Internal clearance of kadma minor from km 0.000 to 3.825 (tail)

Internal clearance of kadma minor from km 0.000 to 3.825 (tail)

Read more
Internal clearance of dhanasari minor from km 0.000 to 2.840 (retender).

Internal clearance of dhanasari minor from km 0.000 to 2.840 (retender).

Read more
Internal clearance of satnali disty. from km 0.000 to 10.044 (tail)

Internal clearance of satnali disty. from km 0.000 to 10.044 (tail)

Read more
Jungle clearance of kabir ...

Jungle clearance kabir minor 25500 to 51835

Read more
Construction of chebri to nagalani road km 0.000 to 3.000 hp09830

Construction of chebri to nagalani road km 0.000 to 3.000 hp09830

Read more

Road side drain clearance, land slide clearance with jungle cutting for pre and post monsoon of 12th mile to nimbong fatak road from 9.30km to 12.00 km and 13.00 km to 16.50 km in the district of kalimpong under kalimpong division p.w.d.

Read more
Supervision consultancy services for existing nh-312 of janipur to bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of wb

Supervision consultancy services for existing nh-312 of janipur-omarpur-krishnagar-bongaon-bashirhat upto ghojadanha section from km 0.000 to km 327.920 in the state of west bengal

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
General premonsoon 2026 27 clearing of jungle and removal of rubbish including maintenance of shoulder and repairs to water cuts along either sides of paved surface clearing of chalked culverts drains etc on various roads under pwd roads section tal

General premonsoon 2026 27 clearing of jungle and removal of rubbish including maintenance of shoulder and repairs to water cuts along either sides of paved surface clearing of chalked culverts drains etc on various roads under pwd roads section tal

Read more
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise