Tender Details
Particulars | Details |
---|---|
Title |
General Construction Of New Building For Pwd Rest House Ponnani Phase Ii (Additional Works) In Malappuram Dt(ponnani L.A.C) Sitc Of Led Tv General Electronics Work
|
Description |
General Construction Of New Building For&Amp#X0d
Pwd Rest House Ponnani Phase Ii (Additional&Amp#X0d
Works) In Malappuram Dt(ponnani L.A.C) &Amp#X0d
Sitc Of Led Tv General Electronics Work
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_PWD_754533_1 |
Reference Number |
120PWDBLDGTR5325/2025_7_1_1/1 |
Tender Fee | 845 |
EMD | 9534 |
Tender Value | |
Place | Electronics Section Manjery |
Link | https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1225084 |
Start Date | March 24, 2025 21:30 |
End Date |
01/04/2025 ( Expired 68 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Replacement and renovation of existing sodium vapour street light fittings with new 250w led fittings at different roads and sitc of 2nos 20m new high mast incl. allied cabling works under kolkata electrical division, pwd.
Read moreJjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Jjm piravanthoor-augmentation of water supply to pathanapuram piravanthoor panchayath in kollam district - construction of 6 mld wtp and allied works-general civil work
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreConstruction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Construction work of rcc drain and culvert in rupapur colony from honda room located on prayagraj road to rajesh vermas house for strengthening the water supply system in pratapgarh district under infrastructure fund.
Read moreConstruction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Construction of control room building and other civil works for setting up new 33/11 kv spread out type sub-station with (2x10) mva power transformer at goaldaha under uluberia division under howrah region.
Read moreConstruction of new building for players and playing at atal khel parisar in ward no. 32 under zone no. 07
Construction of new building for players and playing at atal khel parisar in ward no. 32 under zone no. 07
Read moreInstallation of 10000 ltr per hour capacity packaged type irp including installation of 1 no sbdtw with electrical equipments etc
Construction of semi permanent pump house and other allied works at womens college girls hostel for the fy 2025 26 under dws sub div i collegetilla agartala(deposit work)
Read moreKbc-06 construction of entry and exit buildings of palarivattom junction, alinchuvadu, chembumukku, vazhakkala and padamughal of phase ii of kochi metro rail project excluding architectural and building service works
Kbc-06 construction of entry and exit buildings of palarivattom junction, alinchuvadu, chembumukku, vazhakkala and padamughal of phase ii of kochi metro rail project excluding architectural and building service works
Read moreSupply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Supply, installation, testing, trial and commissioning of 15 hp submersible centrifugal pump for general lift irrigation phase 1 source creation construction of a vcb and allied works in irukutty thodu at odakkalpay kaithakkalpady bhagam
Read moreAnnual maintenance and development of garden in and around porttownship(smruti udyan, nursery, jc colony,gc and gd colony, administrative building, pump house premises(jc and madhuban) and balijhara water works for the year 2025-26
Annual maintenance and development of garden in and around porttownship(smruti udyan, nursery, jc colony,gc and gd colony, administrative building, pump house premises(jc and madhuban) and balijhara water works for the year 2025-26
Read moreof your Industry type