Tender Details

Particulars Details
Title
(I)repairing And Overhauling Of Peddle Separator Unit No. 207 And 208 And Ii) Repairing And Fitting Of 02 Nos. Gear Coupling For Gs 55 Gear Box In 190 Belt Conveyor And Radicon Gear Box In 267 Belt Conveyor In Hms Section Of Kathara Washery
Description
(I)repairing And Overhauling Of Peddle Separator Unit No. 207 And 208 And Ii) Repairing And Fitting Of 02 Nos. Gear Coupling For Gs 55 Gear Box In 190 Belt Conveyor And Radicon Gear Box In 267 Belt Conveyor In Hms Section Of Kathara Washery
Organisation Central Coalfields Limited | Public Sector Undertakings
Tender Id 2025_CCL_324835_1
Reference
Number
PO/KTW/EnM/eTen/24-25/149 Dated-03.01.2025
Tender Fee 0
EMD 3500
Tender Value
Place Kathara Washery
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336720
Start Date January 04, 2025 16:30
End Date

14/01/2025 ( Expired 143 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m

Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m

Read more
Repairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.

Repairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.&#x0d

Read more
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery

Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery

Read more
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.

Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.

Read more
Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.

Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.

Read more
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.

Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.

Read more
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.

Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect

Read more
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma

Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma

Read more
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .

Read more
Upkeepemnt of jammed hopper no. 02 and 06 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .

Upkeepemnt of jammed hopper no. 02 and 06 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise