Tender Details
Particulars | Details |
---|---|
Title |
(I)repairing And Overhauling Of Peddle Separator Unit No. 207 And 208 And Ii) Repairing And Fitting Of 02 Nos. Gear Coupling For Gs 55 Gear Box In 190 Belt Conveyor And Radicon Gear Box In 267 Belt Conveyor In Hms Section Of Kathara Washery
|
Description |
(I)repairing And Overhauling Of Peddle Separator Unit No. 207 And 208 And Ii) Repairing And Fitting Of 02 Nos. Gear Coupling For Gs 55 Gear Box In 190 Belt Conveyor And Radicon Gear Box In 267 Belt Conveyor In Hms Section Of Kathara Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_324835_1 |
Reference Number |
PO/KTW/EnM/eTen/24-25/149 Dated-03.01.2025 |
Tender Fee | 0 |
EMD | 3500 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=336720 |
Start Date | January 04, 2025 16:30 |
End Date |
14/01/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Repairing of 02 damaged geared coupling (male-female) for both gear box side and generator side (coupling connected the gear box shaft and the generator shaft) of 1.2 mw capacity horizontal hydro machine no. 01 and 02 damaged gear coupling (m
Read moreRepairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.
Repairing of complete cabin, denting and spray painting of load body, new glass fitting in door and overhauling of gear box, new pressure plate of clutch plate and radiator repairing of tata truck reg. no. br17g 0473 at tetulmari ocp, sijua area.
Read moreTransportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Transportation and fitting of one nos. 300kw gear box, one no. 6.6kv 300kw motor and replacement of one fgc-11 geared coupling in drum side of 1400 3rd belt conveyor in main incline at mic, jhanjra project colliery
Read moreDismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Dismantling, repairing and replacement of damaged/ worn-out gear coupling, overhauling and adjustment of intermediate pinions, along with re-alignment and re-fitting of gear box, of unit 403-a of moonidih coal washery.
Read moreMaking and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.
Making and fitting of er weight assembly in unit 701 and 702 conveyor belt and refitting of all its accessories at moonidih coal washery.
Read moreRepairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Read moreInstallation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 section of r-vii seam at 3n4 incline, j.p.colly.
Installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 installation of gear coupling, installation of equalizing pinion set, snub drum of 1000mm wide -8d belt conveyor in lhcm-2 sect
Read moreRepairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Repairing of input shaft and intermediate pinion shaft (worn out teeth) of gear box of c4 conveyor in all respect, repairing of the fluid coupling t12-12 and removal of the bearing and gear coupling of the drive shaft including shifting of all the ma
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Read moreUpkeepemnt of jammed hopper no. 02 and 06 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Upkeepemnt of jammed hopper no. 02 and 06 of 701 belt conveyor at ps-5 section at madhuban coal washery under block-ii area, bccl .
Read moreof your Industry type