Tender Details

Particulars Details
Title
Complete Reparing/Rewinding Of 250 Kw 6600v 1490 Rpm Slip Ring Motor Make Marathon Sl.No.186635/2 Of Jhanjra Project Colliery
Description
Complete Reparing/Rewinding Of 250 Kw 6600v 1490 Rpm Slip Ring Motor Make Marathon Sl.No.186635/2 Of Jhanjra Project Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_300182_1
Reference
Number
ECL/GM/JNR/EnM/A2/23-24/96 dated 31.01.2024
Tender Fee 0
EMD 7600
Tender Value
Place JHANJRA UNDERGROUND
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=310949
Start Date February 03, 2024 16:30
End Date

13/02/2024 ( Expired 493 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Complete repairing and converting 5 stage to 6 stage and fitting of pump of make mather and platt, 6 stage , pv-ii, 180m head , 550gpm, si.no.nakc/pump/pv-ii/06 of ug mine 2 seam of new akashkinaree colliery of govindpur area

Complete repairing and converting 5 stage to 6 stage and fitting of pump of make mather and platt, 6 stage , pv-ii, 180m head , 550gpm, si.no.nakc/pump/pv-ii/06 of ug mine 2 seam of new akashkinaree colliery of govindpur area

Read more
Repairing, rewinding and overhauling of 01 no. 3.3 kv 150 kw marathon make motor at socp, ib valley area

Repairing, rewinding and overhauling of 01 no. 3.3 kv 150 kw marathon make motor at socp, ib valley area

Read more
Rewinding and repairing work of stator winding with new coil of insulation class-f with vpi of 290kw, 6.6kv, 1489 rpm (make-marathon) of instrument air compressor motor-1 of unit-i and ii, ctpp (o and m), chhabra.

Rewinding and repairing work of stator winding with new coil of insulation class-f with vpi of 290kw, 6.6kv, 1489 rpm (make-marathon) of instrument air compressor motor-1 of unit-i and ii, ctpp (o and m), chhabra.

Read more
Complete rewinding /repairing installation commissioning and transporting of 500 kva 11kv/440 volt c/g make lighting transformer at durga mandir sub station of kuya colliery.

Complete rewinding /repairing installation commissioning and transporting of 500 kva 11kv/440 volt c/g make lighting transformer at durga mandir sub station of kuya colliery.

Read more
(1) complete repairing of 200 amps kilburn make sd-15 switch 550 volt sl.no.1092 for 40 hp pump at gtc unit asgkcc.(2) repairing of ocb switch 6.6 kv,400amp,sl.no.5705 make gec at salanpur colliery,(3) (a) oil leakage repairin

(1) complete repairing of 200 amps kilburn make sd-15 switch 550 volt sl.no.1092 for 40 hp pump at gtc unit asgkcc.(2) repairing of ocb switch 6.6 kv,400amp,sl.no.5705 make gec at salanpur colliery,(3) (a) oil leakage repairin

Read more
Repairing and rewinding of 90 kw/120 hp, 415 volt, rpm 1485 motor, make siemens, sl. no. uc 0706/02239706 of elecon make feeder breaker under dakra project, nk area

Repairing and rewinding of 90 kw/120 hp, 415 volt, rpm 1485 motor, make siemens, sl. no. uc 0706/02239706 of elecon make feeder breaker under dakra project, nk area

Read more
Complete rewinding n repairing of three nos. lt motor, two nos. transformer n two nos. star delta starter having specification are 60 hp three phase 440 volt induction motor100 hp 415 volt sl. no. nadu4s crompton greaves make three phase induc

Complete rewinding n repairing of three nos. lt motor, two nos. transformer n two nos. star delta starter having specification are 60 hp, three phase 440 volt induction motor, 100 hp, 415 volt, sl. no. nadu4s, crompton greaves make three phase induc

Read more
Complete repairing/rewinding, overhauling and testing of 3 nos, 600 kw, 6.6 kv, 1492 rpm, marathon make ht induction motor sn- 3f660566/7, 3f660566/1 and local no. q/mc/22/01.

Complete repairing/rewinding, overhauling and testing of 3 nos, 600 kw, 6.6 kv, 1492 rpm, marathon make ht induction motor sn- 3f660566/7, 3f660566/1 and local no. q/mc/22/01.

Read more
Click Here to Download Dockets
of your Industry type