Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Guillotine Shearing Machine Etc.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106586404 |
|
Reference Number |
65255016 |
| Tender Fee | 0 |
| EMD | 88640 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/102025/106785767/viewNitPdf_5100534.pdf |
| Start Date | September 02, 2025 21:30 |
| End Date |
Expired
07/10/2025
Expired 347 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply & installation of diff. types of milking machine to 14 camp office for a period of one year
Supply & installation of diff. types of milking machine to 14 camp office for a period of one year
Read moreProcurement of mechanical sweeping machine for maintenance of sanitation under sbm (urban) 2.o funds in nalgonda municipal corporation
Procurement of mechanical sweeping machine for maintenance of sanitation under sbm (urban) 2.o funds in nalgonda municipal corporation
Read moreTender for the procurement, rate contract and supply & installation of cpap machine for different government health institutions of bihar
Tender for the procurement, rate contract and supply & installation of cpap machine for different government health institutions of bihar
Read moreProcurement of parker(markwel)/gates/ manuli make high pressure hydraulic hoses for sdls, lhds jumbo drills, crushers etc., on rate contract for a period of 2 years on specific make basis.
Procurement of parker(markwel)/gates/ manuli make high pressure hydraulic hoses for sdls, lhds jumbo drills, crushers etc., on rate contract for a period of 2 years on specific make basis.
Read moreHiring of high pressure road sweeping machine for cleaning of coal transport roads at ktroc, spl (a) for a period of 3 years-reg.
Hiring of high pressure road sweeping machine for cleaning of coal transport roads at ktroc, spl (a) for a period of 3 years-reg.
Read moreDesign, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house
Read moreDoor to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments, drain cleaning & transportation to the transfer stations/processing site inculding manual road sweeping etc. in municipal corporation, bhagalpur for four (4) years from ward no. 1 to ward no. 51.
Door to door collection, segregation of municipal solid waste (msw) from each residential and commercial establishments, drain cleaning & transportation to the transfer stations/processing site inculding manual road sweeping etc. in municipal corporation, bhagalpur for four (4) years from ward no. 1 to ward no. 51.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreof your Industry type