Tender Details

Particulars Details
Title
Construction Of Road From Km 17.812 To Km 55.377 (Package 2) Of Bile Migging Section (Km 0.00 At Migging End) Of Nh 913 (Frontier Highway) To Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Description
Construction Of Road From Km 17.812 To Km 55.377 (Package 2) Of Bile &#X0d Migging Section (Km 0.00 At Migging End) Of Nh 913 (Frontier Highway) To&#X0d Intermediate Lane On Epc Mode In The State Of Arunachal Pradesh
Organisation Ministry of Road Transport and Highways | Central Govt. Ministry/Department
Tender Id 2025_MoRTH_868318_1
Reference
Number
RW/NH-913/FH/Tender/25-26/15
Tender Fee 60000
EMD 5.13 Crore
Tender Value
Place Itanagar
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=912783

Start Date July 11, 2025 16:30
End Date
Expired 25/09/2025

Expired 279 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode

Read more
Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based maintenance contract in the state of uttar pradesh.

Maintenance of national highway no-35 (old nh-76) from km 37.000 to 107.000 (banda to karvi section) under performance based&#x0d maintenance contract in the state of uttar pradesh.

Read more
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor

Read more
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode

Read more
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313

Read more
Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Short term maintenance of stretch from km. 0.00 to km. 30.000 (assam west bengal border to kachugaon section) as-12, nh-27 in the state of assam.

Read more
Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh

Engagement of user fee agency through e-quotation for shahbpur fee plaza at km 5.925 for the section from km.0.000 to km. 43.000(barabanki-jarwal section) of nh-28c in the state of uttar-pradesh

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of road from km 0.000 to km 17.812 (package-3) of bile- migging section (km 0.00 at migging end) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 0.000 to km 17.812 (package-3) of bile-&#x0d migging section (km 0.00 at migging end) of nh-913 (frontier highway) to&#x0d intermediate lane on epc mode in the state of arunachal pradesh

Read more
Construction of road from km 0.00 to km 27.430 (package-1) of bile- migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate lane on epc mode in the state of arunachal pradesh

Construction of road from km 0.00 to km 27.430 (package-1) of bile-&#x0d migging section (km 0.00 at bile) of nh-913 (frontier highway) to intermediate&#x0d lane on epc mode in the state of arunachal pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise