| Particulars | Details |
|---|---|
| Title |
Shifting, Installation Commissioning, Testing And Calibration Of 01 No 50 Mt Asec Make Road Weigh Bridge From Raw Coal Hopper To New Proposed Site Under Rajrappa Washery
|
| Description |
Shifting, Installation Commissioning, Testing And Calibration Of 01 No 50 Mt Asec Make Road Weigh Bridge From Raw Coal Hopper To New Proposed Site Under Rajrappa Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_CCL_299099_1 |
|
Reference Number |
GM(R)/SO(W)/Rjp/23-24/Et/134dt 19.01.24 |
| Tender Fee | 0 |
| EMD | 2700 |
| Tender Value | - |
| Place | RAJRAPPA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=309818 |
| Start Date | January 21, 2024 00:00 |
| End Date |
Expired
29/01/2024
Expired 987 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Shifting, installation commissioning, testing and calibration of 01 no 50 mt asec make road weigh bridge from raw coal hopper to new proposed site under rajrappa washery
Shifting, installation commissioning, testing and calibration of 01 no 50 mt asec make road weigh bridge from raw coal hopper to new proposed site under rajrappa washery
Read moreAnnual maintainance contract of 50 mt capacity asec make electronic road weigh bridge of rajrappa washery
Annual maintainance contract of 50 mt capacity asec make electronic road weigh bridge of rajrappa washery
Read moreRepairing of 50 mt asec make electronic road weighbridge installed at rajrappa washery
Repairing of 50 mt asec make electronic road weighbridge installed at rajrappa washery
Read moreDismantling, shifting,re-installation, testing and calibration of 01 no. 50mt capacity , asec make road weighbridge from existing place to new proposed site at karma project under kuju area.
Dismantling, shifting,re-installation, testing and calibration of 01 no. 50mt capacity , asec make road weighbridge from existing place to new proposed site at karma project under kuju area.
Read moreShifting erection testing commissioning of different sizes of ms pipes in different places of rajrappa washery.
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery.
Read moreCalibration/testing of newly installed 60 mt road weigh bridge by shifting of 20 mt loose weights from store room to 60 mt road weigh bridge of dugda coal washery.
Calibration/testing of newly installed 60 mt road weigh bridge by shifting of 20 mt loose weights from store room to 60 mt road weigh bridge of dugda coal washery.
Read moreCalibration/testing of newly installed 60 mt road weigh bridge by shifting of 20 mt loose weights from store room to 60 mt road weigh bridge of dugda coal washery.
Calibration/testing of newly installed 60 mt road weigh bridge by shifting of 20 mt loose weights from store room to 60 mt road weigh bridge of dugda coal washery.
Read moreShifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Shifting erection testing n commissioning of different sizes of ms pipes in different places of rajrappa washery
Read moreCutting , dismantling of existing 2 nos. of road sales weighbridge situated at colony and shed structures of raw coal road weighbridge situated near raw coal receiving hopper of rajrappa washery and dismantled materials required to be shifted
Cutting , dismantling of existing 2 nos. of road sales weighbridge situated at colony and shed structures of raw coal road weighbridge situated near raw coal receiving hopper of rajrappa washery and dismantled materials required to be shifted
Read moreDismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project
Dismantling, repairing, fabrication, erection and alignment of reject belt conveyor hopper, liner platform of ps 5 at rajrappa washery project.