Tender Details
Particulars | Details |
---|---|
Title |
Annual Maintenance Contract Of Air Conditioner Under The Work Of Annual Repair And Maintenance At Forensic Science Laboratory, Belgachia, Kolkata From 01.07.2025 To 31.03.2026. (3rd Call)
|
Description |
Annual Maintenance Contract Of Air Conditioner Under The Work Of Annual Repair And Maintenance At Forensic Science Laboratory, Belgachia, Kolkata From 01.07.2025 To 31.03.2026. (3rd Call)
|
Organisation | WEST BENGAL STATE POLICE HOUSING CO. LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 3401 |
Tender Value | |
Place | Refer to NIT |
Link |
AAAAAAAAAA Login to view |
Start Date | June 12, 2025 23:30 |
End Date |
21/06/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreDoor to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreConsultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreSupply of bread (white) and bread (wheatmeal) at air force stn adampur
Supply of bread (white) and bread (wheatmeal) at air force stn adampur for the period from 01 oct 2025 to 30 sep 2026
Read moreSupply of bread (white) and bread (wheatmeal) at air force stn halwara
Supply of bread (white) and bread (wheatmeal) at air force stn halwara for the period from 01 oct 2025 to 30 sep 2026
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read morePerformance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Performance based maintenance contract pbmc for nh 150a from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to national highway division, vijayapura in the state of karnataka
Read moreMaintenance and repair to summer and cooling appliances at no 2afsb mysore under age i af chimney hills
Maintenance and repair to summer and cooling appliances at no 2afsb mysore under age i af chimney hills
Read moreConclusion of contract for supply of fruit fresh at supply depot asc chandimandir and dp kalka for the period from 01 oct 2025 to 30 sep 2026
Conclusion of contract for supply of fruit fresh at supply depot asc chandimandir and dp kalka for the period from 01 oct 2025 to 30 sep 2026
Read moreof your Industry type