Tender Details
Particulars | Details |
---|---|
Title |
Construction Of C.C Road With Drain From Hapania Singha Mura H.O Sri Nitai Shil To Sri Sribash Singh Under Ward No 48,Amc.
|
Description |
Construction Of C.C Road With Drain From Hapania Singha Mura H.O Sri Nitai Shil To Sri Sribash Singh Under Ward No 48,Amc.
|
Organisation | Mayor- Agartala Municipal Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1000 |
EMD | 28070 |
Tender Value | |
Place | Under AMC Div-III. |
Link |
AAAAAAAAAA Login to view |
Start Date | May 08, 2025 17:30 |
End Date |
20/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConstruction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section
Read moreConstruction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan
Read moreConstruction of cc road at ward no. 05 atibal kol house to rajbahor kol house.
Construction of cc road at ward no. 05 atibal kol house to rajbahor kol house.
Read moreConstruction of wbm road at ward no. 11 hari prasad namdev house to gurudatt yadav house.
Construction of wbm road at ward no. 11 hari prasad namdev house to gurudatt yadav house.
Read moreConstruction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward
Construction of cc road from shailendra rajpoot to asgar bhaijan and mulli basor to damoh panna road in gourishankar ward
Read moreConstruction of cc drain at ward no. 02 nandlal kol house to main road.
Construction of cc drain at ward no. 02 nandlal kol house to main road.
Read moreConstruction of cc road at ward no. 13 narendra prajapati house to devi mandir
Construction of cc road at ward no. 13 narendra prajapati house to devi mandir
Read moreConstruction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Read moreof your Industry type