Tender Details

Particulars Details
Title
Beautification Of The Garden From In Front Of Rrr Centre To Jail Road Via Ardd Office Under Ward No 22 Umc Udp 2024 25 Total Length 150.00 M.
Description
Beautification Of The Garden From In Front Of Rrr Centre To Jail Road Via Ardd Office Under Ward No 22 Umc Udp 2024 25 Total Length 150.00 M.
Organisation Director (Urban Development Department) | State Govt. and UT
Tender Id 2025_Urban_60334_1
Reference
Number
DNIeT No 91/DNIT/UMC/UDP/2024-25
Tender Fee 1000
EMD 47430
Tender Value
Place Udaipur
Link https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=61359
Start Date April 11, 2025 21:25
End Date

25/04/2025 ( Expired 19 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km

Read more
Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Construction improvement of rishi rongli kupup from km 53 design chainage km 55.44 to km 70 design chainage km 74.575 net design length 19.135 km from existing cl 9 to nhdl specifications through epc mode in sikkim under project swastik

Read more
Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Design and const of 590 mtr snow gallery, const of 483 mtr snow avalanche catch dam, 100 m loose rock scaling on d-s road approach road to south portal of proposed shinkun la tunnel under 126 rcc 13 tf of project yojak in the state of hp through epc

Read more
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km

Read more
Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Construction of 2 lane service road from km. 1072.900 (umedganj canal) to km. 1079.400 (naya nohara under pass) section of nh 27 (kota bypass) in the state of rajasthan

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise