Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Supply, Erection, Testing And Commissioning For Upgradation Of Electric Traction System From 1 X 25 Kv To 2 X 25 Kv Traction System For Tatanagar(excl.) Bondamunda A Cabin (Incl.) Including Ranchi Bypass Line And Gamharia Kandra (Excl.) Section Of Chakradharpur Division Of South Eastern Railway To Meet 3000 Mt Loading Target.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 78333802 |
|
Reference Number |
SEROHE-TATA-BNDM-A-2x25kV |
| Tender Fee | 0 |
| EMD | 99.39 Lakh |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/122024/78333802/viewNitPdf_4766339.pdf |
| Start Date | November 11, 2024 19:05 |
| End Date |
Expired
27/12/2024
Expired 659 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Design, supply, erection, testing and commissioning for upgradation of electric traction system from 1x25kv to 2x25kv traction system for ranchi(excl.)-bondamunda-bimalgarh-kiriburu(incl.) & barsuan(incl.) section of ranchi and chakradharpur division of south eastern railway to meet 3000 mt loading target.
Read moreEngineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india
Engineering, supply, erection, testing and commissioning of 33 kv power distribution, traction substation, auxiliary substations and 750 v dc third rail traction system for 4 underground metro stations from mominpur (excl.)-esplanade including tunnels and iim station including viaduct from joka (excl.)-iim section of diamond park-joka-esplanade corridor of metro railway, kolkata (west bengal), india
Read moreDesign, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Design, supply, erection, testing & commissioning of 2x25 kv, 50 hz, traction over-head equipment, traction substations, switching stations, scada, general electrical services works along with ohe works in 5 nos of tunnels (total length:7.5 kms), civil engineering works and other associated works between section digras (excl.) - nanded (excl.) 128 rkm /146 tkm of nagpur division in central railway, maharashtra, india
Read moreDesign, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Design, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Read moreDesign/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Design/modification, supply, erection, testing and commissioning of 132kv/2x25 kv scott connected traction sub station and switching posts with at between et to knw section of bhopal division of w c railway to meet 3000mt loading target.
Read moreConstruction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Construction of 4th line track work in between gamharia-chandil (excluding yards) including earthwork, blanketing, major bridges (bridge nos. 329, 334 & 335 for both 3rd & 4th line), road over bridge (6b), road under bridge, minor bridges, lc work and other miscellaneous works for 32.5t indian railway standard loading, execution of indoor & outdoor s&t works, execution of general electrical works, installation and commissioning of 2x25 kv overhead equipment (ohe) for traction
Read moreDesign, supply, erection, testing and commissioning for upgradation of electric traction system from 1 x 25 kv to 2 x 25 kv traction system for kharagpur (excl.) - tatanagar (incl.) section of kharagpur/chakradharpur division of south eastern railway to meet 3000 mt loading target.
For complete deion and other details, please refer to tender
Read moreDesign, supply, erection, testing and commissioning for upgradation of electric traction system from 1 x 25 kv to 2 x 25 kv traction system for muri(excl.) - ranchi (incl.)- tori(excl.) section of ranchi division of south eastern railway to meet 3000 mt loading target.
For complete deion and other details, please refer to tender
Read moreProject supervision services for design, supply, erection, testing and commissioning for upgradation of electric traction system from 1 x 25 kv to 2 x 25 kv traction system for rajkharswan-nayagarh-bolani of chakradharpur division, kharagpur(excl.)-bhadrak (excl.) section of kharagpur division, muri-ranchi-tori section of ranchi division, asansol-adra-bhojodih-dhanbad section of adra division of south eastern railway to meet 3000 mt loading .
For complete deion and other details, please refer to tender
Read moreExtension of existing fob from pf no.01 to new station building at birrajpur between gamharia & kandra in chakradharpur division.
For complete deion and other details, please refer to tender
Read moreof your Industry type