Tender Details

About Tender

🏛️ Repair And Maintenance Services For Handpumps In Chitrangi 💧 The Public Health Engineering, Office Of The Engineer In Chief, State Government And Ut, Invites Bids For The Repair And Maintenance Of Handpumps In The Eastern Part Of Block Chitrangi, Ensuring Continuous Operation For A Period Of 12 Months. 🛠️ 📅 Bid Submission Deadline: May 15, 2024, 5:30 Pm Tender Fee: Inr 5295 Emd: Inr 42100 Interested Bidders Must Provide A Detailed Proposal, Including The Methodology For Maintenance, Repair Strategies, And The Qualifications Of The Departmental Technicians Who Will Be Providing Free Services. The Successful Bidder Will Be Responsible For The Continuous Operation Of The Handpumps Throughout The Contract Period. Keywords: Handpump Repair, Maintenance Services, Public Health Engineering, Chitrangi, Government Tender, Water Supply, Bid Submission, Tender Fee, Earnest Money Deposit (Emd)
Particulars Details
Title
Constt Of Road From Main Gurez Road To Golpathri Nowgam Via Govt Middle School To Ward 02 Nd 07
Description
Constt Of Road From Main Gurez Road To Golpathri Nowgam Via Govt Middle School To Ward 02 Nd 07
Organisation Rural Development and Panchayati Raj | State Govt. and UT
Tender Id 2024_PHED_347795_1
Reference
Number
NIT03
Tender Fee 1800
EMD 68130
Tender Value
Place BANDIPORA
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=857745
Start Date June 25, 2025 14:30
End Date

01/07/2025 ( Expired 1 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode

Independent engineer services for upgradation of existing road to 2l with ps for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh 539) in the state of madhya pradesh on hybrid annuity mode.

Read more
Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Construction/upgradation of existing road to two lane with paved shoulder for the stretch of tikamgarh badagon ghuwara shahgarh from km 75/000 to km 155/700 (nh-539) in the state of madhya pradesh on hybrid annuity mode

Read more
Construction of road kibithu kundao from km 0.000 to km 52.000 design length 0.000 to 19.557 kms green field alignment to nhsl specifications under project udayak in anjaw district of arunachal pradesh state on epc mode

Construction of road kibithu kundao from km 0.000 to km 52.000&#x0d design length 0.000 to 19.557 kms green field alignment to nhsl&#x0d specifications under project udayak in anjaw district of arunachal&#x0d pradesh state on epc mode&#x0d

Read more
Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Work of sohna realignment of rewari sohna palwal road nh-919 (old nh-71b) from km 47.100 to 49.350 in sohna hilly portion on epc mode in the state of haryana.

Read more
Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Consultancy services for feasibility study and dpr preparation for construction of 4 lane road from kadapa to rangampeta cross via rayachoti pileru of nh 40 from km 199.0 to km 337.800 excluding guvvalacheruvu ghat tunnel in the state of ap

Read more
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450

Read more
Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Construction of road changlangshu village to yongkhao village from km 0.00 to km 24.900 ( net length 24.900 km) to nhsl specification under 100 rcc /15 brtf/ project sewak in nagaland state under epc mode

Read more
Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.

Construction of cc road at ward no 10 dulare ahirwar to guddibai and ramsevak to arjun and ghasiram to raju malvi house municipal council narmadapuram mp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise