Tender Details

Particulars Details
Title
Infrastructural Development Of Primary School In Bolkunda Fulberia Gram Panchayat Under Salanpur Area.
Description
Infrastructural Development Of Primary School In Bolkunda Fulberia Gram Panchayat Under Salanpur Area.
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_ECL_319723_1
Reference
Number
SLN/GM/AE(C)/E-Tender/24-25/54 dated 23.10.2024
Tender Fee 0
EMD 6400
Tender Value
Place SALANPUR AREA
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331411

Start Date October 26, 2024 15:30
End Date
Expired 06/11/2024

Expired 620 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.

Read more
Dismantling of anganwadi building koviltheru in pushpavanam panchayat. dismantling of anganwadi building kodiyakarai panchayat. dismantling of anganwadi building therkkukadu in karuppampulam panchayat.

Dismantling of anganwadi building koviltheru in pushpavanam panchayat. dismantling of anganwadi building kodiyakarai panchayat. dismantling of anganwadi building therkkukadu in karuppampulam panchayat.

Read more
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575

Read more
Miscellaneous minor capital civil works in terminal building, ats complex and non-operational area of surat international airport, surat.

Miscellaneous minor capital civil works in terminal building, ats complex and non-operational area of surat international airport, surat.

Read more
Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)

Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)

Read more
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham

Read more
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2

Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&amp#x0d

Read more
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise