Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Infrastructural Development Of Primary School In Bolkunda Fulberia Gram Panchayat Under Salanpur Area.
|
| Description |
Infrastructural Development Of Primary School In Bolkunda Fulberia Gram Panchayat Under Salanpur Area.
|
| Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2024_ECL_319723_1 |
|
Reference Number |
SLN/GM/AE(C)/E-Tender/24-25/54 dated 23.10.2024 |
| Tender Fee | 0 |
| EMD | 6400 |
| Tender Value | |
| Place | SALANPUR AREA |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=331411 |
| Start Date | October 26, 2024 15:30 |
| End Date |
Expired
06/11/2024
Expired 620 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Work of development of infrastructure facilities in shri ram janaki temple located in ward no. 12 sardar bhagat singh nagar of nagar panchayat mathauli district kushinagar.
Read moreDismantling of anganwadi building koviltheru in pushpavanam panchayat. dismantling of anganwadi building kodiyakarai panchayat. dismantling of anganwadi building therkkukadu in karuppampulam panchayat.
Dismantling of anganwadi building koviltheru in pushpavanam panchayat. dismantling of anganwadi building kodiyakarai panchayat. dismantling of anganwadi building therkkukadu in karuppampulam panchayat.
Read moreConstruction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Construction of road on bagoli thikariya mdr-276 in gram jajod (1.10km) ch50/475 to ch51/575
Read moreMiscellaneous minor capital civil works in terminal building, ats complex and non-operational area of surat international airport, surat.
Miscellaneous minor capital civil works in terminal building, ats complex and non-operational area of surat international airport, surat.
Read moreRepairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Repairing of roads excavated by various services, fill up the potholes during rainy season on annual basis in mbmc area. (panel)
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreAnnual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Annual maintenance contract of ofc network in durgapur intracity and last mile connectivity in durgapur and other districts of south bengal (excluding kolkata and surrounding) under ertcc
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type