Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Warder Quarter 4 Units At Central Jail, Sarusajai, Guwahati (G Plus 1) Building With A Provision Of (G Plus 3)
|
Description |
Construction Of Warder Quarter 4 Units At Central Jail, Sarusajai, Guwahati (G Plus 1) Building With A Provision Of (G Plus 3)
|
Organisation | Public Works Building and NH Department | State Govt. and UT |
Tender Id | 2025_PWBNH_41851_1 |
Reference Number |
SE/BII/CENTRAL JAIL_WARDEN QTR. |
Tender Fee | 3000 |
EMD | 2.61 Lakh |
Tender Value | |
Place | Sarusajai, Guwahati |
Link | https://assamtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=67342 |
Start Date | January 06, 2025 20:00 |
End Date |
29/01/2025 ( Expired 124 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Construction and up- gradation to two lane with paved shoulder in km 105.330 to 112.500 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-3) in the state of chhattisgarh.
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreSitc of bed cum passenger lift at ipd building_ opd building_ 2 nos mo quarter and 2 nos nurse quarter buildings
Construction of infrastructure up-gradation of kaliyaganj state general hospital from 60 beds to 250 beds at kaliyaganj in the district of uttar dinajpur - sitc of bed cum passenger lift at ipd building, opd building-2nos mo quarter and 2nos quarter
Read moreConstruction of 50 bedded critical care block g plus 3 at malda medical college and hospital_malda _sitc of lift
Name of work construction of 50 bedded critical care block g_plus_3 at malda medical college and hospital_malda _ sitc of lift
Read moreConstruction of rcc nala at ward 3 and 4 gokuldham colony corner to hakimi township.
Construction of rcc nala at ward 3 and 4 gokuldham colony corner to hakimi township.
Read moreConstruction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Construction of 4- lane railway over bridge for railway crossing no.lc 97 on jaipur-kuchaman khatu tarnau nagaur road (sh-90)at chhoti khatu railway chainage km 448/3-5 of ratangarh-degana section in district didwana-kuchaman (raj) job no crif 1124
Read moreProvision of upvc sliding windows and tiling works in admin building p 15 at dhq 3 new mangalore
Provision of upvc sliding windows and tiling works in admin building p 15 at dhq 3 new mangalore
 
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreof your Industry type