Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
The Work Of Electrical Insulation Arrangement At Ghatkopar Meter Workshop Under Ae(mw)es
|
| Description |
The Work Of Electrical Insulation Arrangement At Ghatkopar Meter Workshop Under Ae(mw)es
|
| Organisation | Municipal Corporation of Greater Mumbai | State Govt. and UT |
| Tender Id | 2024_MCGM_1082897_1 |
|
Reference Number |
Dy.HE/3578/M Dt.23.08.2024 |
| Tender Fee | 500 |
| EMD | 22100 |
| Tender Value | - |
| Place | Ghatkopar Meter Workshop |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1890580 |
| Start Date | September 12, 2024 16:30 |
| End Date |
Expired
26/09/2024
Expired 747 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Spares suitable for everest transmission make air blowers (model: 610 es) of condensate polishing unit service vessels in turbine maintenance division of 500 mw unit
Read moreWork contract for supply cum application of pad type ceramic fiber blanket insulation for drive turbine of tdbfp and other associated system installed at 1 x 500 mw, at sgtps, birsinghpur.
Work contract for supply cum application of pad type ceramic fiber blanket insulation for drive turbine of tdbfp and other associated system installed at 1 x 500 mw, at sgtps, birsinghpur.
Read moreCut model of photo voltaic cell assembly,cut model of lead acid battery,halogen lamp with stand for illumination,inverter 1 kva with 12 v battery input- 12 volt dc, output- 220 volt ac,solar insulation meter,lux meter, lux meter lcd read out 0.05 to 7000 lumens with battery.
Cut model of photo voltaic cell assembly,cut model of lead acid battery,halogen lamp with stand for illumination,inverter 1 kva with 12 v battery input- 12 volt dc, output- 220 volt ac,solar insulation meter,lux meter, lux meter lcd read out 0.05 to 7000 lumens with battery.
Read moreCrc -2-26 500ml can,johnson and johnson 11 kv ht tape,alumunium lug 185 mm,acetone - dr reddys,mcb 63a 4p,dol starter 415v 50hz 3phase mn25,m seal,rustoline 500 ml pack,ht tape,relay aux re 301 jyoti,aux cntr re302 24vdc,digital multimeter,digital clamp meter,dc insulation resistance tester,industrial multimeter,earth resistance meter,insulation resistance tester
Crc -2-26 500ml can,johnson and johnson 11 kv ht tape,alumunium lug 185 mm,acetone - dr reddys,mcb 63a 4p,dol starter 415v 50hz 3phase mn25,m seal,rustoline 500 ml pack,ht tape,relay aux re 301 jyoti,aux cntr re302 24vdc,digital multimeter,digital clamp meter,dc insulation resistance tester,industrial multimeter,earth resistance meter,insulation resistance tester
Read more2.5 kv analog insulation resistance tester megger other detailed as per atc,digital multimeter other detailed as per atc,digital vibration meter other detailed as per atc,digital clamp meter other detailed as per atc,digital contact and non contact rpm meter other detailed as per atc,digital infrared thermometer other detailed as per atc
2.5 kv analog insulation resistance tester megger other detailed as per atc,digital multimeter other detailed as per atc,digital vibration meter other detailed as per atc,digital clamp meter other detailed as per atc,digital contact and non contact rpm meter other detailed as per atc,digital infrared thermometer other detailed as per atc
Read moreConstruction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Construction of workshop shed for proper and safe maintenance work of boiler and its auxiliaries of mtps u1-6 (4x210 puls 2x250 mw) unit, chemical store for unit 7 8,electrical maintenance shed chp u-5 6 dvc mtps.
Read moreWork of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Work of re-insulation of generator rotor coils, damper segment of generator rotor unit no. 4, packing, transportation from sgtps ph-ii to firm workshop n vice versa, work of generator rotor repairing for the rectification of rotor earth of 210, sgtps
Read moreDesign, supply, erection, testing, commissioning and operation and maintenance (o and m) for 25 years of net meter connected ground mounted solar carport power plant of 2.2 mwp (2.2 mw ac capacity) at dda baansera park opposite isbt sarai kale khan
Design, supply, erection, testing, commissioning and operation and maintenance (o and m) for 25 years of net meter connected ground mounted solar carport power plant of 2.2 mwp (2.2 mw ac capacity) at dda baansera park opposite isbt sarai kale khan
Read moreDepartmental estimate for replacing all damaged drums and dismantling repairing of 3 nos. drum float to be used at sump and (2) fixing of 06 nos. electromagnetic flow meter in different pipe line and making arrangement for placing telemetry system
Departmental estimate for replacing all damaged drums and dismantling repairing of 3 nos. drum float to be used at sump and (2) fixing of 06 nos. electromagnetic flow meter in different pipe line and making arrangement for placing telemetry system
Read moreBmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works
Read moreof your Industry type