Tender Details
Particulars | Details |
---|---|
Title |
Procurement Of Fasteners For Overhauling Job Of Coal Mill Zgm123 N, Mill And Aph Ducts, Coal Burner Nozzle Of Stage 1 (2 X300 Mw), Sgtpp.
|
Description |
Procurement Of Fasteners For Overhauling Job Of Coal Mill Zgm123 N, Mill And Aph Ducts, Coal Burner Nozzle Of Stage 1 (2 X300 Mw), Sgtpp.
|
Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 15080 |
Tender Value | |
Place | Sagardighi Thermal Power Project(SgTPP) |
Link |
AAAAAAAAAA Login to view |
Start Date | May 12, 2025 15:30 |
End Date |
21/05/2025 ( 8 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Biennial maintenance contract under the scope of emoph dept. of sgtpp (2x300 mw and 2x500 mw) including township electrical maintenance work.
Biennial maintenance contract under the scope of emoph dept. of sgtpp (2x300 mw and 2x500 mw) including township electrical maintenance work.
Read moreBiennial rc for belt jointing job for coal mill rejection system (as and when required basis) under boiler maintenance department, ktps
Biennial rc for belt jointing job for coal mill rejection system (as and when required basis) under boiler maintenance department, ktps
Read moreTotal maintenance contract of 3 systems (1. ore reclaiming conveyors 2. iosa conveyors and equipments 3. boiler coal and pci conveyors and equipments) for uninterrupted supply of iron ores, fluxes to s.p and b.f and boiler coal to t.p.p and pci to bf
Total maintenance contract of 3 systems (1. ore reclaiming conveyors 2. iosa conveyors and equipments 3. boiler coal and pci conveyors and equipments) for uninterrupted supply of iron ores, fluxes to s.p and b.f and boiler coal to t.p.p and pci to bf
Read moreProcurement of spares for complete coal nozzle assembly for unit 2 overhauling scheduled in july 2026.
Procurement of spares for complete coal nozzle assembly for unit 2 overhauling scheduled in july 2026.
Read moreProcurement of complete drag link chain set of besta raw coal feeder for unit no. 1 and 2 of ph i at sgtps, mppgcl, birsinghpur
Procurement of complete drag link chain set of besta raw coal feeder for unit no. 1 and 2 of ph i at sgtps, mppgcl, birsinghpur
Read moreSupply of 250nb knife edge gate valve suitable for ash slurry pump house of stage 1 and 2
Supply of 250nb knife edge gate valve suitable for ash slurry pump house of stage 1 and 2
Read moreBiennial rate contract for maintenance of tubewells rewinding and repairing of submersible pumps motors maintenance overhauling of various pumps and motors installed in colonies of 1x660 mw ptep panki kanpur
Biennial rate contract for maintenance of tubewells rewinding and repairing of submersible pumps motors maintenance overhauling of various pumps and motors installed in colonies of 1x660 mw ptep panki kanpur
Read moreSealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Sealing services for attending ash leakages from pent house/ wind box (inc material and man power) in annual overhaul (aoh) of the units for boiler of unit-2 2x600 mw, stage-i, and for boiler of unit-4 2x660 mw, stage-ii, sstpp, mppgcl, dongalia
Read moreProposed construction of 1 breeder layer pen house 4500 sq ft 2 breeder growing pen house1900 sq ft 3 commercial growing pen house 1500 sq ft x 4 4 hatchery building 3000 sq ft 5 feed mill 1500 sq ft and 6 compost pit for mortality disposal
Proposed construction of 1 breeder layer pen house 4500 sq ft 2 breeder growing pen house1900 sq ft 3 commercial growing pen house 1500 sq ft x 4 4 hatchery building 3000 sq ft 5 feed mill 1500 sq ft and 6 compost pit for mortality disposal
Read moreComplete repairing, rectification and overhauling works of two nos stainless steel body, kirloskar make, multistage rkb pumps 6 stage, 180 mtr head 500 gpm for mine dewatering in respect of dhori (k) colliery of dhori area.
Complete repairing, rectification and overhauling works of two nos stainless steel body, kirloskar make, multistage rkb pumps 6 stage, 180 mtr head 500 gpm for mine dewatering in respect of dhori (k) colliery of dhori area.
Read moreof your Industry type