Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Paver Block Road With Rcc Cover Drain From The H.O Kartik Banik To H.O Tapan Das Banik Para Under Ward No 40, Amc
|
Description |
Construction Of Paver Block Road With Rcc Cover Drain From The H.O Kartik Banik To H.O Tapan Das Banik Para Under Ward No 40, Amc
|
Organisation | Mayor- Agartala Municipal Corporation | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 4000 |
EMD | 2.21 Lakh |
Tender Value | |
Place | Under AMC Div-III. |
Link |
AAAAAAAAAA Login to view |
Start Date | April 12, 2025 15:30 |
End Date |
25/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreConstruction of rcc drain at ward no 15 suresh sen to kallu saket house
Construction of rcc drain at ward no 15 suresh sen to kallu saket house
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreConstruction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Construction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Read moreConstruction of drain from ashok kahar house to madhu kirana in vivekanand ward, nagar palika parishad, gadarwara
Construction of drain from ashok kahar house to madhu kirana in vivekanand ward, nagar palika parishad, gadarwara
Read moreConstruction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara
Construction of drain from prahlad kushwaha to varma house and kanha kunj to awashthi kirana in niranjan ward, nagar palika parishad, gadarwara
Read moreof your Industry type