Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Estimate For Conductor Augmentation Of 11 Kv Feeder At Dhabla Pump At Location Dhabla Substation To Dhabla Kankad Under Boda Dc. O N M Dn.
|
| Description |
Estimate For Conductor Augmentation Of 11 Kv Feeder At Dhabla Pump At Location Dhabla Substation To Dhabla Kankad Under Boda Dc. O N M Dn. Narsingarh
|
| Organisation | Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited | State Govt. and UT |
| Tender Id | 2025_MKVVC_446480_1 |
|
Reference Number |
DGM/STC-STM/Bia/1353/22.08.25 |
| Tender Fee | 885 |
| EMD | 7600 |
| Tender Value | |
| Place | Biaora |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=525717 |
| Start Date | August 23, 2025 00:25 |
| End Date |
Expired
28/08/2025
Expired 280 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
R/m of flood fighting pump for the year 2026-27.
Hiring of 125 kva capacity silent d.g for operation of electrical flood fighting pump and electrical submersible pump for 04 months at various sites under jurisdiction of fc-iii.
Read moreSitc of transformer and dg set
Augmentation of tccc substation and sitc of diesel generating for providing normal and backup power to under-construction 50 bedded critical care block (ccb) in ng campus of murshidabad medical college an hospital, bhp, msd electrical works
Read moreSupply of 132kv and 33kv indoor gis and related services for augmentation of 132/33kv mawlai substation from 3 x 20mva to 3 x 50mva alongwith re-engineering of 132kv bus bar under nesids otri scheme in meghalaya.
Supply of 132kv and 33kv indoor gis and related services for augmentation of 132/33kv mawlai substation from 3 x 20mva to 3 x 50mva alongwith re-engineering of 132kv bus bar under nesids otri scheme in meghalaya.
Read moreConstruction of 1no. 33kv bay towards reorientation of existing 33kv shivgarh feeder from 132kv ss to 220 kv ss ratlam and providing 33 kv power supply from the vacant bay at 132kv ss ratlam to substation for industrial park alcohol plant ratlam
Construction of 1no. 33kv bay towards reorientation of existing 33kv shivgarh feeder from 132kv ss to 220 kv ss ratlam and providing 33 kv power supply from the vacant bay at 132kv ss ratlam to substation for industrial park alcohol plant ratlam
Read moreA/r and m/o to pwd roads under sub division - 3 of division c and nd - roads (m-413) during 2025-26. (sh - repair of roof, floor, replace of door, , renovation of toilets with all sanitary fittings, floor and wall tiles etc. of azad bhawan pump
A/r and m/o to pwd roads under sub division - 3 of division c and nd - roads (m-413) during 2025-26. (sh - repair of roof, floor, replace of door, , renovation of toilets with all sanitary fittings, floor and wall tiles etc. of azad bhawan pump
Read moreConstruction of 1 no. 132kv bay equivalent to al-59 panther conductor for providing grid connectivity to 100mw/200mwh bess power project of m/s vrindavan solar pvt. ltd. at 220kv gss bap.
Construction of 1 no. 132kv bay equivalent to al-59 panther conductor for providing grid connectivity to 100mw/200mwh bess power project of m/s vrindavan solar pvt. ltd. at 220kv gss bap.
Read moreEstimate for re-organization of lt line network damaged due to land slide at village kunduni on dated 03.09.2025 in (e) section majharanoo under esd no i hpsebl, joginder nagar.
Estimate for re-organization of lt line network damaged due to land slide at village kunduni on dated 03.09.2025 in (e) section majharanoo under esd no i hpsebl, joginder nagar.
Read moreA/r and m/o pwd roads under sub division-2 of division c and nd- roads during 2026-27. (sh -provision of various remedial measures to mitigate the water logging at critical points on pwd roads under sub division-2 of c and nd- roads division).
A/r and m/o pwd roads under sub division-2 of division c and nd- roads during 2026-27. (sh -provision of various remedial measures to mitigate the water logging at critical points on pwd roads under sub division-2 of c and nd- roads division).
Read moreA/r and m/o non residential building under svpnd, apwd, sri vijaya puram during 2025-26. sw_repair and renovation of badminton court for sports flooring at ces office complex, sri vijaya puram under supply line section, sd-ii, svpnd, apwd, sri vijaya
A/r and m/o non residential building under svpnd, apwd, sri vijaya puram during 2025-26. sw_repair and renovation of badminton court for sports flooring at ces office complex, sri vijaya puram under supply line section, sd-ii, svpnd, apwd, sri vijaya
Read moreConstruction of lane and edging from shiv mandir to h/o jasbir singh at ward no 6 ,pyt aghar ballian block reasi under cdf for the year 26-27
Construction of lane and edging from shiv&#x0d mandir to h/o jasbir singh at ward no 6 ,pyt&#x0d aghar ballian block reasi under cdf for the&#x0d year 26-27 &#x0d
Read moreof your Industry type