Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Replacement Of 33 Kv Panel At Mdda Substation Due To Offunder Edsd Prade Ground.
|
| Description |
Replacement Of 33 Kv Panel At Mdda Substation Due To Offunder Edsd Prade Ground.
|
| Organisation | MD - UPCL | State Govt. and UT |
| Tender Id | 2024_UPCL4_74951_1 |
|
Reference Number |
Tender No.10/EDC(U)/2024-25 |
| Tender Fee | 11800 |
| EMD | 2.91 Lakh |
| Tender Value | - |
| Place | as per tender specification |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=89672 |
| Start Date | August 28, 2024 23:30 |
| End Date |
Expired
09/09/2024
Expired 762 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of earth pits in sccl 132/33 kv substation, corporate
Construction of earth pits in sccl 132/33 kv substation, corporate
Read moreConstruction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality
Construction of major storm water drain from 33 kv substation to haritha hotel via kerala english medium school in dharmapuri municipality
Read moreOperation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Read moreDesign, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Design, supply, testing, installation and commissioning along with comprehensive annual maintenance contract (camc) for 10 (ten) years of a grid-connected 1 mw / 4 mwh (4-hour) battery energy storage system (bess) on 100 percent turnkey basis at the 33/11 kv waterworks substation karimnagar district of tgnpdcl.
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 12, gajularamaram (near oxygen park) with 1x16 mva ptr, connected 33kv and 11 kv lines in gajularamaram section of qutbullapur sub-division in medchal division of medchal operation circle, in master plan sub-division 2 of wcgh division in ranga reddy master plan circle under t and d improvement works
Read moreErection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Erection of new 33/11kv outdoor substation and construction of control room, compound wall and other civil works at sy no. 62 of hmda layout in medipally with 1x16 mva ptr, connected 33kv and 11 kv lines in narapally section of ghatkesar sub-division in keesara division of habsiguda operation circle, in master plan sub-division 2 of wcgh division in rangareddy master plan circle under t and d improvement works.
Read moreErection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works
Erection of new 33/11kv indoor substation with 1x12.5 mva ptr, connected 33kv and 11 kv lines, construction of control room and other civil works at sy. no 239,240,247 and 249, bahadurpally, dundigal-gandimaisamma (m), medchal-malkajgiri district in dummara pochampally(dp pally) section of shapur nagar sub-division in jeedimetla division of medchal operation circle, in master plan sub-division 1 of wcgh division of ranga reddy circle under t and d improvement works
Read moreReplacement of old 33 kv panels at 33/11 kv s/s nehru colony substation due to offunder edsd araghar.
Replacement of old 33 kv panels at 33/11 kv s/s nehru colony substation due to offunder edsd araghar.
Read more11 kv network from mdda s/s to kwality chowk through clock tower and making ring n/w of 11 kv between mdda s/s to prade ground s/s under edsd prade ground.
11 kv network from mdda s/s to kwality chowk through clock tower and making ring n/w of 11 kv between mdda s/s to prade ground s/s under edsd prade ground.
Read moreReplacement of 33 kv panel at 33/11 kv substation ihm due to offand difficulties in operation under edsd vasant vihar.
Replacement of 33 kv panel at 33/11 kv substation ihm due to offand difficulties in operation under edsd vasant vihar.
Read moreof your Industry type