Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Anti Corrosive Treatment Painting In Tunnel/Tunnel Approach Under Sse/P.Way/Karwar Section
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 72727831 |
Reference Number |
KR-KW-OL-W-2023-87-RB |
Tender Fee | 0 |
EMD | 40200 |
Tender Value | |
Place | Navi Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022024/72727831/viewNitPdf_4434632.pdf |
Start Date | January 24, 2024 22:17 |
End Date |
08/02/2024 ( Expired 505 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Reconstruction of existing major bridge near manik nagar at km.99.225 on nh 50 bidar humnabad section in the state of karnataka under annual plan 2024 25 on epc mode
Read more2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreWbphed/ee/md/niet_21 (2nd call) of 2025-2026, sl. no.27
Augmentation work of boundary wall, pump house and construction pathway approach road at head work site of jatradanga water supply scheme of old malda block under malda division, p.h.e.dte. in the district of malda. (2nd call)
Read more4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
4lane with paved shoulders from km0.00 ranganathpura (hassan) to km 76.16 (keresooragondanahalli) in hassan-hiriyur section of ec-20 in karnataka on ham under nh (o)
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreof your Industry type