| Particulars | Details |
|---|---|
| Title |
Earth Filling And Laying Of Interlocking Tiles With Base Cc And Drainage Related Work For Prion From Water Logging At Electricity Store Centre Bijnor Distt. Bijnor.
|
| Description |
Earth Filling And Laying Of Interlocking Tiles With Base Cc And Drainage Related Work For Prion From Water Logging At Electricity Store Centre Bijnor Distt. Bijnor.
|
| Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
| Tender Id | 2025_PVVNL_1018602_1 |
|
Reference Number |
111/ECDC/GZB/2024-25 |
| Tender Fee | 3540 |
| EMD | 30500 |
| Tender Value | - |
| Place | BIJNOR |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1836441 |
| Start Date | March 18, 2025 14:30 |
| End Date |
Expired
25/03/2025
Expired 566 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreCivil work related to treatment of water logging earth filling laying interlocking tiles and drainage at electricity store centre bijnor distt bijnor
Civil work related to treatment of water logging earth filling laying interlocking tiles and drainage at electricity store centre bijnor distt bijnor
Read moreEarth filling work, laying interlocking tile and associated civil work for protection water logging at store centre hydel colony victoria park, meerut
Earth filling work, laying interlocking tile and associated civil work for protection water logging at store centre hydel colony victoria park, meerut
Read more110kv substation- kalpetta - earth cutting and filling
Earthwork excavation back filling behind abutment earth work in rough excavation additional conveyance of earth etc
Read moreInterlocking tiles work, earth filling at tyonga school w.no. 58
Interlocking tiles work, earth filling at tyonga school w.no. 58
Read morePolice line bijnor rtc mess ke store room no 2 me tiles lagane ka karya
Police line bijnor rtc mess ke store room no 2 me tiles lagane ka karya
Read moreConstruction of retaining cum boundary wall, guard wall, earth filling, drainage line and other ancillary civil works at zonal store, siliguri at shibmandir, district-darjeeling
Construction of retaining cum boundary wall, guard wall, earth filling, drainage line and other ancillary civil works at zonal store, siliguri at shibmandir, district-darjeeling
Read moreEarth filling and construction of approach road, rcc drain, external boundary wall, ms gate
Earth filling and construction of approach road, rcc drain, external boundary wall, ms gate at newly acquired land of 132/33kv tangla gss, aegcl.
Read moreof your Industry type