Tender Details

Particulars Details
Title
Bhe/Pw/Pur/Rgmt Eco Mod U1 U2/2844
Description
Dismantling, Fabrication, Erection, Welding, Ndt Of Economiser Hopper Structural Members And Removal And Re Fixing Of Insulation And Cladding Of Eco Hopper Duct In Unit 1 And Unit 2 At 2 X800 Mw, Te Stpp Ntpc Ramagundam
Organisation Bharat Heavy Electricals Limited (BHEL)
Tender Id 2023_BHEL_27967_1
Reference
Number
BHE/PW/PUR/RGMT-ECO MOD U1 U2/2844
Tender Fee 0
EMD 0
Tender Value
Place Online Nagpir
Link https://eprocurebhel.co.in
Start Date August 24, 2023 20:30
End Date

04/09/2023 ( Expired 621 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v

Ttps operation circle cad cwph ii dismantling the badly worn out working platform and fabrication and erection of new m.s structural working platform for 1200mm butterfly valve in cwph ii at unit iv and v

Read more
Patch welding to be done for rectification of damaged flue gas duct from aph-b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure ( cd) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix

Patch welding to be done for rectification of damaged flue gas duct from aph b hopper to chimeny along the path cd side flue gas duct and its honeycomb structure c and d after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix

Read more
Patch welding to be done for rectification of damaged flue gas duct from aph-a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( ab) after dismantling the damaged / worn out portion of flue gas ducts for overhaul of unit ix

Patch welding to be done for rectification of damaged flue gas duct from aph a hopper to chimeny along the path ab side flue gas duct and its honeycomb structure ( a and b) after dismantling the damaged worn out portion of flue gas ducts for overhaul of unit ix

Read more
Dismantling and erection of metalic expansion joints ( 1.rcej 4/5000x3100x561, 2.rcej4/4100x3700x561, 3.rcej1-half size/3874x5574x81mm 4.rcej1/7000x4000x186) along with protection plate and welding of corner piece of expansion joint rcej2-3058x3358x272mm in unit-ix in the annual overhaul period.

Dismantling and erection of metalic expansion joints 1.rcej 4/5000x3100x561 2.rcej 4 4100x3700x561 3.rcej 1-half size 3874x5574x81mm and 4.rcej 1 7000x4000x186 along with protection plate and welding of corner piece of expansion joint rcej 2-3058x3358x272mm in unit-ix in the annual overhaul period.

Read more
Revival of stator of unit no 2 at sghep

Design, manufacturing, supply, erection , supervision of erection, testing and commissioning of new vpi insulated stator winding and dismantling, re varnishing and re stacking of the existing stator core of 55 mw unit no2 generator at sghep

Read more
Revival of stator of unit no 2 at sghep

Design, manufacturing, supply, erection , supervision of erection, testing and commissioning of new vpi&amp#x0d insulated stator winding and dismantling, re varnishing and re stacking of the existing stator core of 55 mw unit no2 generator at sghep

Read more
Repair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi

Repair, fabrication and erection of water supply main pipe line 8 inch dia near by back gate, welding of 6 inch dia gi pipe line near by water stock tank and new fitting of pipe line 2 inch dia from 80 b/c take-up drum to 00 level, dismantling and fi

Read more
Dismantling of existing civil department material storage sheds 1 and 2 and re-erection the shed 1 for rsps no.2 project at tnpl unit i

Dismantling of existing civil department material storage sheds 1 and 2 and re-erection the shed 1 for rsps no.2 project at tnpl unit i

Read more
Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii removal and re fixing of wool mattress or cera blanket insulation of turbine casing and their allied pipe lines valves and hp heaters for the period from 01 04 25 to 31 03 26

Read more
Ttps mech ii tm i unit i ii iii breakdown maintenance of hdpe pipes of various size from 150nb to 450nb plastic welding of punctured joint new joints dismantling and re erection of the hdpe pipes 01 04 25 to 31 3 26

Ttps mech ii tm i unit i ii iii breakdown maintenance of hdpe pipes of various size from 150nb to 450nb plastic welding of punctured joint new joints dismantling and re erection of the hdpe pipes 01 04 25 to 31 3 26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise