Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tyre Puncture Kit,Dust Cap,Cold Patch Solution,Valve Core,Cold Patch,Cold Patch,Cold Patch
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3622558 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | June 27, 2023 22:20 |
| End Date |
Expired
10/07/2023
Expired 1193 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | GIT LINKS | - | 07-07-2023 18:59:43 | N/A | Qualified |
| 2 | JYOTI ENTERPRISE | - | 07-07-2023 17:56:24 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | JYOTI ENTERPRISE | Item Categories : TYRE PUNCTURE KIT,DUST CAP,COLD PATCH SOLUTION,VALVE CORE,COLD PATCH,COLD PATCH,COLD PATCH | 4925.00 | L1 |
| 2 | GIT LINKS | Item Categories : TYRE PUNCTURE KIT,DUST CAP,COLD PATCH SOLUTION,VALVE CORE,COLD PATCH,COLD PATCH,COLD PATCH | 5400.00 | L2 |
Starting valve cap (union) to drg no. 320-37(as per drawings and specifications)
Starting valve cap (union) to drg no. 320-37(as per drawings and specifications)
Read moreStandard dry nitrogen gas,valve spindle replacement,total valve replacement,cylinder cap or valve guard,gland nut replacement,neck ring replacement,oil trace removable,painting for cylinder,valve fitting,hydro static testing
Standard dry nitrogen gas,valve spindle replacement,total valve replacement,cylinder cap or valve guard,gland nut replacement,neck ring replacement,oil trace removable,painting for cylinder,valve fitting,hydro static testing
Read moreOutsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Outsourcing of rubber lagging, cold vulcanizing joint and patch works for belts working at jvr chp, sathupally area for a period of 2 years
Read morePcr tube 0point2ml with attached snap cap,gloves for acid handling,propan 2 ol,hematoxylin cryst microscopy,solution for leishman stain for lab
Pcr tube 0point2ml with attached snap cap,gloves for acid handling,propan 2 ol,hematoxylin cryst microscopy,solution for leishman stain for lab
Read moreAppointment of an agency for information systems (is) audit of core banking solution (cbs), atm switch, data centre (dc), disaster recovery (dr) site and network infrastructure.
Appointment of an agency for information systems (is) audit of core banking solution (cbs), atm switch, data centre (dc), disaster recovery (dr) site and network infrastructure.
Read moreChakan industrial area phase i ,ii , iii and iv m and r to roads for year 2026-2027 potholes filling by cold mix material (with ready mix patch repairing compound.)
Chakan industrial area phase i ,ii , iii and iv m and r to roads for year 2026-2027 potholes filling by cold mix material (with ready mix patch repairing compound.)
Read moreTyre pressure gauge valve 0 10 kg cm2,tripod fire control instrument no14 mk,auxilary set engines driven,oil primingpump mzn 2 w ele motor mn1 2s,buffer
Tyre pressure gauge valve 0 10 kg cm2,tripod fire control instrument no14 mk,auxilary set engines driven,oil primingpump mzn 2 w ele motor mn1 2s,buffer
Read moreRewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Rewinding of lt motor and restacking of stator and rotor core, replacement of rotor aluminum bars of abb make 110kw, 415v dust extraction motor, pertaining to lt/em/chp for the year 2026 - 27
Read moreMedia convertor,utp cat 6 cable,patch panel,rack mounted odf 24 core,e2k to e2k,e2k to sc,rj 45 connector,io box,l2 managed switch,tool kit for telecom
Media convertor,utp cat 6 cable,patch panel,rack mounted odf 24 core,e2k to e2k,e2k to sc,rj 45 connector,io box,l2 managed switch,tool kit for telecom
Read moreEv truck with charger 01 tyre with wheel rim accessories if any erection and commissioning along with standard tools and tackles price must be inclusive of 2 sets of battery chargers for 4 dumpers,1st year cost cap price - 3500 running hrs per dumper,2nd year cost cap price npv applicable - 3500 running hrs per dumper,3rd year cost cap price npv applicable - 3500 running hrs per dumper,4th year cost cap price npv applicable - 3500 running hrs per dumper,5th year cost cap price npv applicable - 3500 running hrs per dumper
Ev truck with charger 01 tyre with wheel rim accessories if any erection and commissioning along with standard tools and tackles price must be inclusive of 2 sets of battery chargers for 4 dumpers,1st year cost cap price - 3500 running hrs per dumper,2nd year cost cap price npv applicable - 3500 running hrs per dumper,3rd year cost cap price npv applicable - 3500 running hrs per dumper,4th year cost cap price npv applicable - 3500 running hrs per dumper,5th year cost cap price npv applicable - 3500 running hrs per dumper
Read moreof your Industry type