Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fdr/Mtc. Of Road From T01 (U.S Road) To Nimchand Para (L 3.330 Km)
|
| Description |
Sh Patch Metalling, Re Carpeting And Seal Coat. During The Year 2024 25. (Portion From 1.110 Km To 2.385 Km). Gr Ii
|
| Organisation | Chief Engineer, PWD (R and B) | State Govt. and UT |
| Tender Id | 2024_CEPWD_52569_1 |
|
Reference Number |
18(6)/PNIeT/EE/PWD/SBM/24-25 |
| Tender Fee | 1000 |
| EMD | 48512 |
| Tender Value | - |
| Place | Satchand Sub-Division |
| Link |
View Original Tender Notice
https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=53580 |
| Start Date | September 11, 2024 14:30 |
| End Date |
Expired
17/09/2024
Expired 739 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fdr /mtc. of road from t01 (u.s road) to nimchand para (l- 3.330 km)
Sh -patch metalling, re-carpeting seal coat and wire cratesetc. during the year 2024-25. (portion from 2.385km to 3.330 km). gr-lll
Read moreFdr/mtc. of road from t01 (u.s road) to nimchand para (l- 3.330 km) / sh -patch metalling, re-carpeting and seal coat. during the year 2024-25. (portion from 1.110 km to 2.385 km). gr-i
Fdr/mtc. of road from t01 (u.s road) to nimchand para (l- 3.330 km) / sh -patch metalling, re-carpeting and seal coat. during the year 2024-25. (portion from 1.110 km to 2.385 km). gr-i
Read moreFdr/mtc. of road from madhubari to goursing bari via haridhan para (l- 3.050 km)
Sh- construction of boxcell (1m x1m), gsb, wbm-iii, paver block etc. during the year 2024-25. (portion from ch. 2.70 km to ch. 2.875 km). gr-i
Read moreMtc of road from us road (t01) to basi sarder para (l059),sabroom south tripura under satchand block ( l-7.069 km)
S.h- patch metalling, re-carpeting and seal coat etc. during the year 2024-25.(portion from 1.200 km to 2.460 km).gr-ii
Read moreMtc of road from us road (t01) to basi sarder para (l059),sabroom south tripura under satchand block ( l-7.069 km)
S.h-patch metalling, re-carpeting and seal coat etc. during the year 2024-25.(portion from 0.00 km to 1.200 km). gr-i
Read moreFdr/ urgent mtc. of road from nh-08 to nishimalla para (l-0.950 km) and old nh44 (0.090 km)
Sh- flat brick soling, grouting, re-carpeting, tack coat, seal oat, surface drain etc. during the year 2024-25
Read moreFdr/mtc. of road from mohon tripura house to acharjee para (l-3.80km)
Sh-construction of gabian structure, rcc retaining wall for protection of road side erosion at different chainage under pwd(r and b) rupaichari sub-division during the year 2024-25. (gr-i).
Read moreFdr/mtc. of road from mohon tripura house to acharjee para (l-3.80km)
Sh-construction of gabian structure, rcc retaining wall for protection of road side erosion at different chainage under pwd(r and b) rupaichari sub-division during the year 2024-25. (gr-ii)
Read moreUrgent mtc. of road from l022-t01 sadhanarayan basu para to laltilla mog para
Wbm-iii, concrete blocks, carpeting, repairs to road by potholes repair, re-carpeting, road side drain etc. during the year 2024-25.
Read moreFdr/mtc. of road from manu-srinagar road to sankar tilla via kaladepha, nalsing sardar para, debendra para under satchand block (l- 6.80 km)
S.h. -patch metalling, re-carpeting and seal coat etc. during the year 2024- 25. (portion from ch. 0.00 km to ch. 1.330 km). gr -i
Read moreof your Industry type