Tender Details
Particulars | Details |
---|---|
Title |
Electrical Trd Ohe Portion Work Involve In Construction Of Full Length Loop Lines At Either Side Of Up &Amp Dn Track To Increase The Sectional Capacity At Malvali Station In Pune Division.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77094143 |
Reference Number |
PUNE_ELECT_TRD_2024_20 |
Tender Fee | 0 |
EMD | 3.21 Lakh |
Tender Value | |
Place | Mumbai CST |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/112024/77094143/viewNitPdf_4695142.pdf |
Start Date | October 01, 2024 22:52 |
End Date |
04/11/2024 ( Expired 192 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 3 three nos. new single cell type box culvert 2.0 m x 3.0 m at km 54.150 km 54.750 and km 55.150 of nh 117 including improvement of flaring portion on either side of each culvert during the year 2024 2025 under n.h division no. i in
Construction of 3 three nos. new single cell type box culvert 2.0 m x 3.0 m at km 54.150 km 54.750 and km 55.150 of nh 117 including improvement of flaring portion on either side of each culvert during the year 2024 2025 under n.h division no. i in
Read moreSignalling & telecom work in connection with malavali: construction of full length loop lines at either side up & dn tracks to increase the sectional capacity .
For complete deion and other details, please refer to tender
Read moreBengaluru-dharmavaram section: construction of rcc side drain for a length of 1200m in connection with the work of complete track renewal(p) of existing 60kg rails on 60kg psc with 60kg 90uts rails on 60kg psc of 1660/km for a length of 11.60km from 46/500-56/134 dn & 56/134-58/100 up between oddarahalli - thondebhavi station in sse/pway/hup section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreA]ctr(p) under sse/pw/tgn section. (construction of full-length loop lines at either side up & dn tracks to increase the sectional capacity at mvl station 1.5 km) b]ctr(p) under sse/pw/tgn section. (development of goods shed facilities at tgn station) new line constructed 0.95 km).
For complete deion and other details, please refer to tender
Read moreElectrical trd ohe portion work involve in construction of full length loop lines at either side of up & dn track to increase the sectional capacity at malvali station in pune division.
For complete deion and other details, please refer to tender
Read moreA/r and m/o to various non residential building under sub division we-13, new delhi during 2024-25. (sh- electrical work at udyog nagar fire station, tikri kalan fire station, jwala puri fire station, jwala etc(full name of work mentioneed in nit)
A/r and m/o to various non residential building under sub division we-13, new delhi during 2024-25. (sh- electrical work at udyog nagar fire station, tikri kalan fire station, jwala puri fire station, jwala etc(full name of work mentioneed in nit)
Read moreUp gradation of the existing main lt panel at sub station of raj bhawan, darjeeling under darjeeling electrical sub-division (pwd), darjeeling
Up gradation of the existing &#x0d main lt panel at sub &#x0d station of raj bhawan, &#x0d darjeeling under darjeeling &#x0d electrical sub-division &#x0d (pwd), darjeeling
Read moreTree plantation at indira nagar jogging track to d.g.p nagar, pune road to up nagar and road side in nashik east division
Tree plantation at indira nagar jogging track to d.g.p nagar, pune road to up nagar and road side in nashik east division
Read moreof your Industry type