Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Platform For 02 No. Prefab Huts At Sheshnag Camp For Yatra 2024
|
| Description |
Construction Of Platform For 02 No. Prefab Huts At Sheshnag Camp For Yatra 2024
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_SASB_229953_1 |
|
Reference Number |
SASB/eNIT/2023/33 |
| Tender Fee | 400 |
| EMD | 6000 |
| Tender Value | - |
| Place | Shri Amarnathji Shrine Board Srinagar |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | September 16, 2023 14:30 |
| End Date |
Expired
21/09/2023
Expired 1082 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of retaining wall and providing revetment for wind row platform embackment and construction of drains at swm site of cmc ramanagara at harisandra
Construction of retaining wall and providing revetment for wind row platform embackment and construction of drains at swm site of cmc ramanagara at harisandra
Read moreTurn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Turn key contract for design, engineering, construction, testing and commissioning of two(02) nos. of 2x10 mva, 33/11 kv new pss at belwdangi & sitalpur in katihar district along with associated 33 kv and 11 kv lines under state plan.
Read moreConstruction of platform / plinth for 04 no huts and fabrication, supply and installation of prefabricated huts 04 nos at sheshnag camp for yatra 2024.
Construction of platform / plinth for 04 no huts and fabrication, supply and installation of prefabricated huts 04 nos at sheshnag camp for yatra 2024.
Read moreRepair / re- construction of prefab huts at outsource huts spot ( dismantled huts) by new construction wooden frame with ppgi covering for enhancement of accommodation at sheshnag camp for yatra 2023.
Repair / re- construction of prefab huts at outsource huts spot ( dismantled huts) by new construction wooden frame with ppgi covering for enhancement of accommodation at sheshnag camp for yatra 2023.
Read moreStrengthening of prefab huts at upper camps i.e. sheshnag, zojibal, and chandanwari etc. after yatra-2024
Strengthening of prefab huts at upper camps i.e. sheshnag, zojibal, and chandanwari etc. after yatra-2024
Read moreStrengthing of prefab huts at upper camps ie sheshnag, zojibal, and chandanwari etc. after yatra-2023
Strengthing of prefab huts at upper camps ie sheshnag, zojibal, and chandanwari etc. after yatra-2023
Read moreRenting and housekeeping operations of shri amarnathji shrine boards prefabricated huts at sheshnag camp during yatra 2023
Renting and housekeeping operations of shri amarnathji shrine boards prefabricated huts at sheshnag camp during yatra 2023
Read moreErection and dismembering of prefabricated huts at chandwari, sheshnag and panchtarni yatra 2026
Erection and dismembering of prefabricated huts at chandwari, sheshnag and panchtarni yatra 2026
Read moreRemoval of snow from hut sites and other spots at sheshnag camp for yatra -2026.
Removal of snow from hut sites and other spots at sheshnag camp for yatra -2026.
Read moreof your Industry type