Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Field Channel/Drain At Work Site Zormal Yen In Village Malik Gund For A Length Of 200 Meters Project, Senguloo (Tail End)
|
| Description |
Construction Of Field Channel/Drain At Work Site Zormal Yen In Village Malik Gund For A Length Of 200 Meters From Rd100 200 And Rd00 100.
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_APD_235279_1 |
|
Reference Number |
e-NIT No.25 of 2023-24 |
| Tender Fee | 400 |
| EMD | 11238 |
| Tender Value | - |
| Place | Assistant Soil Cons. Officer, CAD Pulwama |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | November 01, 2023 21:30 |
| End Date |
Expired
13/11/2023
Expired 1066 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of tractor crossing at rd 365m on khordee khal and field channel taking of from khordee khal of d-6 rd 370m and construction of field channel taking of from tail end of d/o 65900
Construction of tractor crossing at rd 365m on khordee khal and field channel taking of from khordee khal of d-6 rd 370m and construction of field channel taking of from tail end of d/o 65900
Read moreGeneral - gps ii 2026 - 27-modernisation of field channel - at kallelipotta offtaking near ch 13.900 km of lbmc (lhs) bet.ch 0.000 km and 1.000 km and approach road to kizhakkethara tail end field channel crossing near ch 0.250 km - general civil wor
Modernisation of field channel - at kallelipotta offtaking near ch 13.900 km of lbmc (lhs) bet.ch 0.000 km and 1.000 km and approach road to kizhakkethara tail end field channel crossing near ch 0.250 km
Read moreGeneral-gps ii 2026-27-modernisation of field channel-offtaking from tail end of nandankizhaya branch canal bet. ch 0/000km and ch.0/150 km.-general civil work
Cada rectification works
Read moreConstruction of field channel from l/o mohd.ramzan malik to l/o gh.nabi dar at rawatpora batwina b block wakura cdf
Construction of field channel from l/o mohd.ramzan malik to l/o gh.nabi dar at rawatpora batwina b block wakura cdf
Read moreRestoration of d-2 channel of lis bathera of mrc from rd 0-85m and 600m to tail end.
Restoration of d-2 channel of lis bathera of mrc from rd 0-85m and 600m to tail end.
Read moreGeneral pothundy project 2026 27 renovation and modernisation works to tail end of kiliyallur field bothie of chittilancherry north branch canal of rbmc
General pothundy project 2026 27 renovation and modernisation works to tail end of kiliyallur field bothie of chittilancherry north branch canal of rbmc
Read moreAnnual maintaining and monitoring ponnar main channel from ls 0/0 mile to tail end, 5 tanks, drainage channel and coleroon left bank from mile 47/6 to 67/3 under jurisdiction of madanathur irrigation section in udayarpalayam taluk ariyalur district
Annual maintaining and monitoring ponnar main channel from ls 0/0 mile to tail end, 5 tanks, drainage channel and coleroon left bank from mile 47/6 to 67/3 underjurisdiction of madanathur irrigation section udayarpalayam taluk ariyalur district
Read moreGeneral- gps - i - rbc - 2026 - 27 - modernisation of -vakkode payyappully field canal (offtakes from tail end straight of pudunagaram branch canal) from ch. 0.350 km to 0.700 km-general civil work
Modernisation of -vakkode payyappully field canal (offtakes from tail end straight of pudunagaram branch canal) from ch. 0.350 km to 0.700 km
Read moreIp ptz camera as per specs,ip bullet fixed camera as per specs,mcb dual pole 6a c curve per jb,32 channel nvr,visual monitoring software 29 cameras,43 inch high res led,client machine intel i7,industrial 8 port poe switch with 2 sfp ports,liu fo patch panel 06 port loded at camera end,fiber patch cord,junction box ip67 rated,6 mtr pole for camera,27u networking rack for mounting fo patch panels liu ethernet switches, servers, fo convertors,liu fo patch panel 24 port loaded,industrial 24 port gigabit switch w 4 sfp ports,5 kva ups with external battery,power distribution box having 4 mcbs of 16a rating, 3 nos of 10a rating, 1 nos. 32a rating incomer,f.o cables - 6 core armoured for camera in meters,power cable 2 c x 2.50 sq mm power cable for camera in meters,cat6 stp utp cable,32 mm hdpe pipe,25 mm pvc conduit for cat- 6 cable in meters,camera and accessories installation,fo cables lay,power cable laying in meters,cat-6 stp cable - laying in meters,hdpe conduit - laying in meters,pvc conduit - laying in meter
Ip ptz camera as per specs,ip bullet fixed camera as per specs,mcb dual pole 6a c curve per jb,32 channel nvr,visual monitoring software 29 cameras,43 inch high res led,client machine intel i7,industrial 8 port poe switch with 2 sfp ports,liu fo patch panel 06 port loded at camera end,fiber patch cord,junction box ip67 rated,6 mtr pole for camera,27u networking rack for mounting fo patch panels liu ethernet switches, servers, fo convertors,liu fo patch panel 24 port loaded,industrial 24 port gigabit switch w 4 sfp ports,5 kva ups with external battery,power distribution box having 4 mcbs of 16a rating, 3 nos of 10a rating, 1 nos. 32a rating incomer,f.o cables - 6 core armoured for camera in meters,power cable 2 c x 2.50 sq mm power cable for camera in meters,cat6 stp utp cable,32 mm hdpe pipe,25 mm pvc conduit for cat- 6 cable in meters,camera and accessories installation,fo cables lay,power cable laying in meters,cat-6 stp cable - laying in meters,hdpe conduit - laying in meters,pvc conduit - laying in meter
Read moreConstruction of field channel/drain at work site sathwoth yen in village dangerpora for a length of 300 meters project, senguloo tail end
Construction of field channel/drain at work site sathwoth yen in village dangerpora for a length of 300 meters from rd400-700.
Read moreof your Industry type