Tender Details

Particulars Details
Title
Repairing Of Rear Left Side Final Drive And Seal Replacement Of Braking System Of Cat Dumper Model 773 D Sl. No. 607.
Description
Repairing Of Rear Left Side Final Drive And Seal Replacement Of Braking System Of Cat Dumper Model 773 D Sl. No. 607.
Organisation Bharat Coking Coal Limited | Public Sector Undertakings
Tender Id 2025_BCCL_332419_1
Reference
Number
BCCL/BII/EXC/REP/e-Tender/ 24-25 /197 Dt.13.03.25
Tender Fee 0
EMD 2695
Tender Value
Place ABOCP
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=344605
Start Date March 13, 2025 19:30
End Date

24/03/2025 ( Expired 27 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
De-watering, mud cleaning, repairing , painting of two no clarifloculator (both inside and out side) of etp at ktps

De-watering, mud cleaning, repairing , painting of two no clarifloculator (both inside and out side) of etp at ktps

Read more
Repairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl

Repairing / testing and transportation of the failed cummins make engine (esn 33182273), model-qsk-60 of beml make dumper sl. no. 99006 , model-bh205e from hhp rebuilt centre, pune to nigahi project, ncl

Read more
Annual maintenance contract for maintenance and repair of air conditioning system fitted in operator cabin of komatsu d475a dozer sl no t-30547 and t-30551 at dozer section, nws nigahi project

Annual maintenance contract for maintenance and repair of air conditioning system fitted in operator cabin of komatsu d475a dozer sl no t-30547 and t-30551 at dozer section, nws nigahi project

Read more
Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Emandmrt- inspection of hydrogen sealing assembly system (seal and seal rings) inner oil catchers generator and exciter bearings no 5, 6 and 7 and hydrogen and exciter coolers of 250 mw unit 9 of ktps-v stage during annual overhaul period 2025-26.

Read more
Strengthening, repairing and renovation of existing drain in around the gana sewa bhawan , side of gate no.5,gate no.2,parking along with main drain etc.at assam secretariat complex, dispur, guwahati-6

Strengthening, repairing and renovation of existing drain in around the gana sewa bhawan , side of gate no.5,gate no.2,parking along with main drain etc.at assam secretariat complex, dispur, guwahati-6

Read more
Repairing of dump body side wall extension part of cat789d 190t dumper sl. no. 1013 at new work shop , nigahi project

Repairing of dump body side wall extension part of cat789d 190t dumper sl. no. 1013 at new work shop , nigahi project

Read more
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction

Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction

Read more
Repairing of cabin and rear body damaged, electrical wiring tank along with denting painting of fire tender reg. no. cg 12 bb 2480.

Repairing of cabin and rear body damaged, electrical wiring tank along with denting painting of fire tender reg. no. cg 12 bb 2480.

Read more
Replacement of two carriages with control system of unit 7 technical building, dpps with 01 no. passenger elevator and 01 no. goods elevator

Replacement of two carriages with control system of unit 7 technical building, dpps with 01 no. passenger elevator and 01 no. goods elevator

Read more
Supply, installation testing and commissioning of replacement of existing forced air supply an exhaust system in bldg no 7 and installation of new gaseous effluent treatment plant(getp) setup for interfacing of exhaust system of bldg no 7

Supply, installation testing and commissioning of replacement of existing forced air supply an exhaust system in bldg no 7 and installation of new gaseous effluent treatment plant(getp) setup for interfacing of exhaust system of bldg no 7

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise