Tender Details

Particulars Details
Title
Supplying And Filling The Low Lying Area Using Gravel At Available Vacant Land In The South West Side At Apca Campus In Vellore District.
Description
Supplying And Filling The Low Lying Area Using Gravel At Available Vacant Land In The South West Side At Apca Campus In Vellore District.
Organisation Tamil Nadu Police Housing Corporation | Supdt. Engineer(North Circle) - TNPHC | Villupuram Division - TNPHC
Tender Id Login to view
Reference
Number
Login to view
Tender Fee -
EMD 24900
Tender Value 29.79 Lakh
Place Tamil Nadu
Link Login to view
Start Date September 15, 2026 23:25
End Date
Open 28/10/2026

13 days left

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Corrigenda & Amendments (1)

The issuing authority has issued modifications/date extensions for this tender.

#1 Date

Date Corrigendum

Similar Tenders
Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Supplying and earth filling in proposed bus stand low lying site area at venkulamkarai in kollencode municipality.

Read more
Clearing of jungle and filling with gravel in low level area at market yard alampur under amc., alampur of jogulamba gadwal district.

Clearing of jungle and filling with gravel in low level area at market yard alampur under amc., alampur of jogulamba gadwal district.

Read more
Clearing of jungle and filling with gravel in low level area at ieeza sub - market yard under amc., alampur of jogulamba gadwal district.

Clearing of jungle and filling with gravel in low level area at ieeza sub - market yard under amc., alampur of jogulamba gadwal district.

Read more
Handling and transport on lumpsum basis - environment-friendly evacuation and transportation of fly ash from stage-2/3 silos of korba stpp for filling low lying areas/quarries within 100 km

Handling and transport on lumpsum basis - environment-friendly evacuation and transportation of fly ash from stage-2/3 silos of korba stpp for filling low lying areas/quarries within 100 km

Read more
Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Cutting of grass, pruning of trees, shrub, bushes upto boundary including clearing the dry grass outside md land and filling of earth in both side of low lying area of runway at shibpur under (s) diglipur

Read more
Gdr-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation, providing central & cross drains to limited length on up & dn line from km.181.200-184.000 in formation of height greater than 3m for a length of 2.800km.

Gdr-bza section: tftr- widening/ repair of cess, filling up low lying areas near toe of bank to avoid water stagnation, providing central & cross drains to limited length on up & dn line from km.181.200-184.000 in formation of height greater than 3m for a length of 2.800km.

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Filling of low lying areas

Filling of low lying areas and potholes at various locations in peerzadiguda area under 100 days action plan programme in peerzadiguda municipal corporation under general funds 2025-26

Read more
Filling of low lying areas

Filling of low lying areas and potholes at various locations in parvathapur area under 100 days action plan programme in peerzadiguda municipal corporation under general funds 2025-26

Read more
Filling of low lying areas

Filling of low lying areas and potholes at various locations in medipally area under 100 days action plan programme in peerzadiguda municipal corporation under general funds 2025-26

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise