Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kiifb Pallimukk Junction Boundary Stone Laying General Civil Work Investigation Work
|
| Description |
The Estimate Includes Items Necessary&Amp#X0d
For Alignment Fixation And Laying Of Boundary&Amp#X0d
Stones.
|
| Organisation | Kerala Road Fund Board | State Govt. and UT |
| Tender Id | 2024_KRFB_707741_1 |
|
Reference Number |
PWD/KR/8830/2024-2025 |
| Tender Fee | 555 |
| EMD | 4035 |
| Tender Value | - |
| Place | Pallimukku-Kollam |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1108785 |
| Start Date | November 21, 2024 19:30 |
| End Date |
Expired
30/11/2024
Expired 684 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
General-ayanthikkadavu bridge- boundary stone planting-planting boundary stone for demarking land to be acquired-general civil work
Civil work
Read moreGeneral investigation work for providing roundabout at puthupally junction in kottayam kozhencherry road ch 5/200 investigation work general civil work
Some traffic safety measures such as barricades were adopted in this junction to divert traffic to different directions. but as the junction is not signalized and existing provisions for diverting the traffic is not adequate. hence for studying the s
Read moreStone metal 26.56,stone chips 22.40,stone chips 13.20,stone chips 11.20,stone chips 6.70,sand
Stone metal 26.56,stone chips 22.40,stone chips 13.20,stone chips 11.20,stone chips 6.70,sand
Read moreSurvey, investigation and execution for laying of storm water rcc pipe along boundary wall and inside blw campus
Survey, investigation and execution for laying of storm water rcc pipe along boundary wall and inside blw campus, varanasi
Read moreGeophysical investigation
Geophysical investigation and study and survey work to obtain level along the downstream slope i and ii at different stations at beas dam
Read moreAnnual plan-2026-27 of edavanna gp , project no397/27 pallimukk school road side protection-in ward 19-general civil work
Annual plan-2026-27 of edavanna gp , project no397/27 pallimukk school road side protection-in ward 19-general civil work
Read moreStone metal 20 mm,stone metal 40 mm,stone metal 10 mm,sand for pmt
Stone metal 20 mm,stone metal 40 mm,stone metal 10 mm,sand for pmt
Read moreof your Industry type